June 17 - June 21, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
20-Jun-2013 |
21-Jun-2013 |
Seoul, Korea |
KRW 550000 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
20-Jun-2013 |
21-Jun-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| PME305 Aspen InfoPlus.21: Advanced System Administration |
20-Jun-2013 |
21-Jun-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
June 24 - June 28, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| APC2400 Advanced Process Control Application Development and Online Deployment |
24-Jun-2013 |
25-Jun-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| APC2600 Advanced Process Control Performance Monitoring |
24-Jun-2013 |
26-Jun-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
24-Jun-2013 |
26-Jun-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
24-Jun-2013 |
26-Jun-2013 |
Calgary, AB, Canada |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
24-Jun-2013 |
26-Jun-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
24-Jun-2013 |
28-Jun-2013 |
Houston, TX |
USD 3000 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
24-Jun-2013 |
28-Jun-2013 |
Virtual-EMEA |
GBP 2000 |
Register Now |
Logistics
|
English |
| PME1200 Calculations and Data Analysis for Engineers |
24-Jun-2013 |
26-Jun-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
24-Jun-2013 |
28-Jun-2013 |
Houston, TX |
USD 3000 |
Register Now |
Logistics
|
English |
| RPA201 Aspen PIMS: Solving Refinery Planning Problems |
24-Jun-2013 |
28-Jun-2013 |
Singapore |
SGD 3700 |
Register Now |
Logistics
|
English |
| EAP2911 Solids Modeling Using Aspen Plus |
26-Jun-2013 |
26-Jun-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EAP321 Aspen Plus: Advanced Topics in Equation Oriented Modeling |
26-Jun-2013 |
26-Jun-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| APC1020 Advanced Process Control Installing and Configuring |
27-Jun-2013 |
28-Jun-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
27-Jun-2013 |
28-Jun-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
27-Jun-2013 |
28-Jun-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Spanish |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
27-Jun-2013 |
28-Jun-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EHY2351 Modeling Heavy Oil & Gas Production and Facilities Using Aspen HYSYS Upstream |
27-Jun-2013 |
28-Jun-2013 |
Calgary, AB, Canada |
USD 1200 |
Register Now |
Logistics
|
English |
| PME123 Aspen Calc: Using and Configuring |
27-Jun-2013 |
28-Jun-2013 |
Virtual-Americas |
USD 900 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
28-Jun-2013 |
28-Jun-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
28-Jun-2013 |
28-Jun-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
July 1 - July 5, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
01-Jul-2013 |
02-Jul-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| EHX1021 Design and Rate Air Cooled Heat Exchangers |
01-Jul-2013 |
01-Jul-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EHX2911 Improved Energy Efficiency through Heat Integration |
01-Jul-2013 |
02-Jul-2013 |
Singapore |
SGD 1480 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
01-Jul-2013 |
03-Jul-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
01-Jul-2013 |
01-Jul-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
01-Jul-2013 |
02-Jul-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| PME171 Aspen Production Record Manager: Retrieving Batch Data using the Reporting Tools |
01-Jul-2013 |
01-Jul-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| PME271 Aspen Production Record Manager: Configuring the Batch Area and Feed Application |
02-Jul-2013 |
03-Jul-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP251 Aspen Rate-Based Distillation (Aspen RateSep) |
04-Jul-2013 |
05-Jul-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
04-Jul-2013 |
05-Jul-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
05-Jul-2013 |
05-Jul-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP2121 Process Flowsheet Convergence in Aspen Plus |
05-Jul-2013 |
05-Jul-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHX1031 Design and Simulation of Fired Heaters Using Aspen Fired Heater |
05-Jul-2013 |
05-Jul-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
July 8 - July 12, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| EAP101 Aspen Plus: Process Modeling |
08-Jul-2013 |
10-Jul-2013 |
Beaumont, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
08-Jul-2013 |
10-Jul-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
08-Jul-2013 |
10-Jul-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EAP2980 Simulation of Electrolyte Processes With Aspen Plus |
08-Jul-2013 |
09-Jul-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EEE1011 Introduction to Aspen Capital Cost Estimator |
08-Jul-2013 |
11-Jul-2013 |
Reading, UK |
GBP 1600 |
Register Now |
Logistics
|
English |
| EEE1011 Introduction to Aspen Capital Cost Estimator |
08-Jul-2013 |
11-Jul-2013 |
Houston, TX |
USD 2400 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
08-Jul-2013 |
09-Jul-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
08-Jul-2013 |
10-Jul-2013 |
Calgary, AB, Canada |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
08-Jul-2013 |
10-Jul-2013 |
Virtual-EMEA |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
08-Jul-2013 |
10-Jul-2013 |
Tokyo, Japan |
JPY 129000 |
Register Now |
Logistics
|
Japanese |
| EHY101 Aspen HYSYS: Process Modeling |
08-Jul-2013 |
10-Jul-2013 |
Virtual-Latin America |
USD 1050 |
Register Now |
Logistics
|
Portuguese |
| EHY101 Aspen HYSYS: Process Modeling |
08-Jul-2013 |
10-Jul-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
08-Jul-2013 |
09-Jul-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
08-Jul-2013 |
09-Jul-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
08-Jul-2013 |
12-Jul-2013 |
Virtual-Americas |
USD 3000 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
08-Jul-2013 |
12-Jul-2013 |
Lansing, MI |
USD 3000 |
Register Now |
Logistics
|
English |
| PME201 Aspen SQLplus for Aspen InfoPlus.21: Using and Configuring for Power Users |
08-Jul-2013 |
12-Jul-2013 |
Virtual-EMEA |
GBP 2000 |
Register Now |
Logistics
|
English |
| PME201 Aspen SQLplus for Aspen InfoPlus.21: Using and Configuring for Power Users |
08-Jul-2013 |
12-Jul-2013 |
Houston, TX |
USD 3000 |
Register Now |
Logistics
|
English |
| PME311 Aspen InfoPlus.21: Applications Development |
08-Jul-2013 |
12-Jul-2013 |
Virtual-Americas |
USD 3000 |
Register Now |
Logistics
|
English |
| RPA100 Essential PIMS Concepts and Economic Analysis for Managers & Economists |
08-Jul-2013 |
09-Jul-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Spanish |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
08-Jul-2013 |
12-Jul-2013 |
Virtual-Americas |
USD 3000 |
Register Now |
Logistics
|
English |
| RPA201 Aspen PIMS: Solving Refinery Planning Problems |
08-Jul-2013 |
12-Jul-2013 |
Virtual-EMEA |
GBP 2000 |
Register Now |
Logistics
|
English |
| APC2400 Advanced Process Control Application Development and Online Deployment |
10-Jul-2013 |
12-Jul-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHX1041 Introduction to Aspen Plate Fin Exchanger |
10-Jul-2013 |
10-Jul-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EHX1100 Modeling Heat Exchangers Using the Exchanger Design and Rating Suite |
10-Jul-2013 |
12-Jul-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHX2911 Improved Energy Efficiency through Heat Integration |
10-Jul-2013 |
12-Jul-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY2351 Modeling Heavy Oil & Gas Production and Facilities Using Aspen HYSYS Upstream |
10-Jul-2013 |
11-Jul-2013 |
Chennai, India |
INR 16400 |
Register Now |
Logistics
|
English |
| EHY2351 Modeling Heavy Oil & Gas Production and Facilities Using Aspen HYSYS Upstream |
10-Jul-2013 |
11-Jul-2013 |
Pune, India |
INR 16400 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
11-Jul-2013 |
12-Jul-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
11-Jul-2013 |
12-Jul-2013 |
Beaumont, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
11-Jul-2013 |
12-Jul-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
11-Jul-2013 |
12-Jul-2013 |
Perth, Australia |
AUD 1320 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
11-Jul-2013 |
12-Jul-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
11-Jul-2013 |
12-Jul-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Portuguese |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
11-Jul-2013 |
12-Jul-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
11-Jul-2013 |
12-Jul-2013 |
Calgary, AB, Canada |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
11-Jul-2013 |
11-Jul-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
11-Jul-2013 |
12-Jul-2013 |
Tokyo, Japan |
JPY 86000 |
Register Now |
Logistics
|
Japanese |
| EHY2611 Heat Transfer Modeling Using Aspen HYSYS |
11-Jul-2013 |
11-Jul-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
12-Jul-2013 |
12-Jul-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EAP2121 Process Flowsheet Convergence in Aspen Plus |
12-Jul-2013 |
12-Jul-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP2121 Process Flowsheet Convergence in Aspen Plus |
12-Jul-2013 |
12-Jul-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
12-Jul-2013 |
12-Jul-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
12-Jul-2013 |
12-Jul-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
July 15 - July 19, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| EAP101 Aspen Plus: Process Modeling |
15-Jul-2013 |
17-Jul-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
15-Jul-2013 |
17-Jul-2013 |
Virtual-Latin America |
USD 1050 |
Register Now |
Logistics
|
Portuguese |
| EAP101 Aspen Plus: Process Modeling |
15-Jul-2013 |
17-Jul-2013 |
Frankfurt, Germany |
EUR 1560 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
15-Jul-2013 |
16-Jul-2013 |
Perth, Australia |
AUD 1320 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
15-Jul-2013 |
15-Jul-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP2411 Improved Process Operability and Control through Aspen Plus Dynamic Models |
15-Jul-2013 |
17-Jul-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
15-Jul-2013 |
16-Jul-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
15-Jul-2013 |
16-Jul-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EEE1011 Introduction to Aspen Capital Cost Estimator |
15-Jul-2013 |
18-Jul-2013 |
King Of Prussia, PA |
USD 2400 |
Register Now |
Logistics
|
English |
| EEE1011 Introduction to Aspen Capital Cost Estimator |
15-Jul-2013 |
18-Jul-2013 |
Virtual-Americas |
USD 2400 |
Register Now |
Logistics
|
English |
| EEE1011 Introduction to Aspen Capital Cost Estimator |
15-Jul-2013 |
18-Jul-2013 |
Virtual-EMEA |
GBP 1600 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
15-Jul-2013 |
16-Jul-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EHX2911 Improved Energy Efficiency through Heat Integration |
15-Jul-2013 |
17-Jul-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
15-Jul-2013 |
17-Jul-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
15-Jul-2013 |
17-Jul-2013 |
Calgary, AB, Canada |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
15-Jul-2013 |
16-Jul-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| PME201 Aspen SQLplus for Aspen InfoPlus.21: Using and Configuring for Power Users |
15-Jul-2013 |
19-Jul-2013 |
Reading, UK |
GBP 2000 |
Register Now |
Logistics
|
English |
| PME201 Aspen SQLplus for Aspen InfoPlus.21: Using and Configuring for Power Users |
15-Jul-2013 |
19-Jul-2013 |
Virtual-Americas |
USD 3000 |
Register Now |
Logistics
|
English |
| PME311 Aspen InfoPlus.21: Applications Development |
15-Jul-2013 |
19-Jul-2013 |
Houston, TX |
USD 3000 |
Register Now |
Logistics
|
English |
| RBS121 Aspen Petroleum Scheduler: Building and Using Models (Aspen Orion XT) |
15-Jul-2013 |
19-Jul-2013 |
Reading, UK |
GBP 2000 |
Register Now |
Logistics
|
English |
| RBS131 Aspen Refinery Multi-Blend Optimizer: Blend Planning and Scheduling (Aspen MBO) |
15-Jul-2013 |
16-Jul-2013 |
Virtual-Asia Pacific |
SGD 1480 |
Register Now |
Logistics
|
English |
| RBS131 Aspen Refinery Multi-Blend Optimizer: Blend Planning and Scheduling (Aspen MBO) |
15-Jul-2013 |
16-Jul-2013 |
Singapore |
SGD 1480 |
Register Now |
Logistics
|
English |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
15-Jul-2013 |
19-Jul-2013 |
Virtual-Latin America |
USD 1750 |
Register Now |
Logistics
|
Spanish |
| APC1400 Introduction to Advanced Process Control using DMCplus |
16-Jul-2013 |
19-Jul-2013 |
Tokyo, Japan |
JPY 172000 |
Register Now |
Logistics
|
Japanese |
| EHY208 Aspen HYSYS: Migration to V8 |
16-Jul-2013 |
16-Jul-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
17-Jul-2013 |
19-Jul-2013 |
Singapore |
SGD 2220 |
Register Now |
Logistics
|
English |
| EAP121 Building MS Excel User Interfaces for Aspen Plus Simulations Using Aspen Simulation Workbook |
17-Jul-2013 |
17-Jul-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP121 Building MS Excel User Interfaces for Aspen Plus Simulations Using Aspen Simulation Workbook |
17-Jul-2013 |
17-Jul-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
17-Jul-2013 |
17-Jul-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EHX1041 Introduction to Aspen Plate Fin Exchanger |
17-Jul-2013 |
17-Jul-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| PME122 - Aspen Process Explorer: Using and Configuring |
17-Jul-2013 |
17-Jul-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| RPA151 Aspen Advisor: Operations Reconciliation and Accounting |
17-Jul-2013 |
19-Jul-2013 |
Virtual-Asia Pacific |
SGD 2220 |
Register Now |
Logistics
|
English |
| RPA151 Aspen Advisor: Operations Reconciliation and Accounting |
17-Jul-2013 |
19-Jul-2013 |
Singapore |
SGD 2220 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
18-Jul-2013 |
19-Jul-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Portuguese |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
18-Jul-2013 |
19-Jul-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
18-Jul-2013 |
19-Jul-2013 |
Frankfurt, Germany |
EUR 1040 |
Register Now |
Logistics
|
English |
| EAP251 Aspen Rate-Based Distillation (Aspen RateSep) |
18-Jul-2013 |
19-Jul-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP2611 Heat Transfer Modeling Using Aspen Plus |
18-Jul-2013 |
18-Jul-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHX131 Heat Exchanger Mechanical Design using Aspen Shell & Tube Mechanical (Aspen Teams) |
18-Jul-2013 |
18-Jul-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
18-Jul-2013 |
19-Jul-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
18-Jul-2013 |
18-Jul-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
18-Jul-2013 |
19-Jul-2013 |
Calgary, AB, Canada |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY2611 Heat Transfer Modeling Using Aspen HYSYS |
18-Jul-2013 |
18-Jul-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| PME123 Aspen Calc: Using and Configuring |
18-Jul-2013 |
19-Jul-2013 |
Reading, UK |
GBP 600 |
Register Now |
Logistics
|
English |
| RPA221 Aspen PIMS: Advanced Optimization Features |
18-Jul-2013 |
19-Jul-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
19-Jul-2013 |
19-Jul-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EAP2121 Process Flowsheet Convergence in Aspen Plus |
19-Jul-2013 |
19-Jul-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
July 22 - July 26, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| APC2600 Advanced Process Control Performance Monitoring |
22-Jul-2013 |
24-Jul-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
22-Jul-2013 |
24-Jul-2013 |
Baton Rouge, LA |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
22-Jul-2013 |
22-Jul-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EAP2311 Building Custom Simulation Models using Aspen Custom Modeler |
22-Jul-2013 |
24-Jul-2013 |
Frankfurt, Germany |
EUR 1560 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
22-Jul-2013 |
23-Jul-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| EEE1011 Introduction to Aspen Capital Cost Estimator |
22-Jul-2013 |
25-Jul-2013 |
Calgary, AB, Canada |
USD 2400 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
22-Jul-2013 |
23-Jul-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
22-Jul-2013 |
23-Jul-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
22-Jul-2013 |
24-Jul-2013 |
Virtual-EMEA |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
22-Jul-2013 |
24-Jul-2013 |
Virtual-Latin America |
USD 1050 |
Register Now |
Logistics
|
Portuguese |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
22-Jul-2013 |
24-Jul-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
22-Jul-2013 |
24-Jul-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY2351 Modeling Heavy Oil & Gas Production and Facilities Using Aspen HYSYS Upstream |
22-Jul-2013 |
23-Jul-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY2351 Modeling Heavy Oil & Gas Production and Facilities Using Aspen HYSYS Upstream |
22-Jul-2013 |
23-Jul-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
22-Jul-2013 |
26-Jul-2013 |
Virtual-EMEA |
GBP 2000 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
22-Jul-2013 |
26-Jul-2013 |
Virtual-Latin America |
USD 1750 |
Register Now |
Logistics
|
Spanish |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
22-Jul-2013 |
26-Jul-2013 |
Houston, TX |
USD 3000 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
22-Jul-2013 |
26-Jul-2013 |
Reading, UK |
GBP 2000 |
Register Now |
Logistics
|
English |
| PME201 Aspen SQLplus for Aspen InfoPlus.21: Using and Configuring for Power Users |
22-Jul-2013 |
26-Jul-2013 |
Pune, India |
INR 41000 |
Register Now |
Logistics
|
English |
| RBS121 Aspen Petroleum Scheduler: Building and Using Models (Aspen Orion XT) |
22-Jul-2013 |
26-Jul-2013 |
Virtual-Americas |
USD 3000 |
Register Now |
Logistics
|
English |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
22-Jul-2013 |
26-Jul-2013 |
Reading, UK |
GBP 2000 |
Register Now |
Logistics
|
English |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
22-Jul-2013 |
26-Jul-2013 |
Houston, TX |
USD 3000 |
Register Now |
Logistics
|
English |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
22-Jul-2013 |
26-Jul-2013 |
Singapore |
SGD 3700 |
Register Now |
Logistics
|
English |
| EAP121 Building MS Excel User Interfaces for Aspen Plus Simulations Using Aspen Simulation Workbook |
24-Jul-2013 |
24-Jul-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EAP2911 Solids Modeling Using Aspen Plus |
24-Jul-2013 |
24-Jul-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EHX1041 Introduction to Aspen Plate Fin Exchanger |
24-Jul-2013 |
24-Jul-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
24-Jul-2013 |
26-Jul-2013 |
Seoul, Korea |
KRW 825000 |
Register Now |
Logistics
|
Korean |
| PME122 - Aspen Process Explorer: Using and Configuring |
24-Jul-2013 |
24-Jul-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
25-Jul-2013 |
26-Jul-2013 |
Baton Rouge, LA |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
25-Jul-2013 |
26-Jul-2013 |
Frankfurt, Germany |
EUR 1040 |
Register Now |
Logistics
|
English |
| EAP2611 Heat Transfer Modeling Using Aspen Plus |
25-Jul-2013 |
25-Jul-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EHX131 Heat Exchanger Mechanical Design using Aspen Shell & Tube Mechanical (Aspen Teams) |
25-Jul-2013 |
25-Jul-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
25-Jul-2013 |
25-Jul-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
25-Jul-2013 |
25-Jul-2013 |
Virtual-Latin America |
USD 350 |
Register Now |
Logistics
|
Portuguese |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
25-Jul-2013 |
25-Jul-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
25-Jul-2013 |
25-Jul-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
25-Jul-2013 |
25-Jul-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
25-Jul-2013 |
26-Jul-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| PME123 Aspen Calc: Using and Configuring |
25-Jul-2013 |
26-Jul-2013 |
Virtual-Americas |
USD 900 |
Register Now |
Logistics
|
English |
| RPA221 Aspen PIMS: Advanced Optimization Features |
25-Jul-2013 |
26-Jul-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| SLM101 Aspen Software License Management and Deployment |
25-Jul-2013 |
26-Jul-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
26-Jul-2013 |
26-Jul-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
26-Jul-2013 |
26-Jul-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EAP2911 Solids Modeling Using Aspen Plus |
26-Jul-2013 |
26-Jul-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
26-Jul-2013 |
26-Jul-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
26-Jul-2013 |
26-Jul-2013 |
Calgary, AB, Canada |
USD 600 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
26-Jul-2013 |
26-Jul-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
July 29 - August 2, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| APC2600 Advanced Process Control Performance Monitoring |
29-Jul-2013 |
31-Jul-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| APC2900 Process Property Estimator Development and Deployment |
29-Jul-2013 |
31-Jul-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP2411 Improved Process Operability and Control through Aspen Plus Dynamic Models |
29-Jul-2013 |
31-Jul-2013 |
Baton Rouge, LA |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
29-Jul-2013 |
30-Jul-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
29-Jul-2013 |
30-Jul-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Spanish |
| EAP2510 CO2 Removal Processes Using Aspen Plus |
29-Jul-2013 |
31-Jul-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EEE102 Aspen Process Economic Analyzer (Aspen IPE) |
29-Jul-2013 |
31-Jul-2013 |
Calgary, AB, Canada |
USD 1800 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
29-Jul-2013 |
30-Jul-2013 |
Seoul, Korea |
KRW 550000 |
Register Now |
Logistics
|
English |
| EHY2102 Aspen HYSYS Petroleum Refining: Process Modeling and Optimization for Refinery Unit Operations |
29-Jul-2013 |
31-Jul-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
29-Jul-2013 |
31-Jul-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY2351 Modeling Heavy Oil & Gas Production and Facilities Using Aspen HYSYS Upstream |
29-Jul-2013 |
30-Jul-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
29-Jul-2013 |
02-Aug-2013 |
Tokyo, Japan |
JPY 215000 |
Register Now |
Logistics
|
Japanese |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
29-Jul-2013 |
02-Aug-2013 |
Virtual-Americas |
USD 3000 |
Register Now |
Logistics
|
English |
| PME201 Aspen SQLplus for Aspen InfoPlus.21: Using and Configuring for Power Users |
29-Jul-2013 |
02-Aug-2013 |
Singapore |
SGD 3700 |
Register Now |
Logistics
|
English |
| PME261 Aspen Production Execution Manager: Programming Concepts (Aspen eBRS) |
29-Jul-2013 |
31-Jul-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| PME305 Aspen InfoPlus.21: Advanced System Administration |
29-Jul-2013 |
30-Jul-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Spanish |
| PME305 Aspen InfoPlus.21: Advanced System Administration |
29-Jul-2013 |
30-Jul-2013 |
Pune, India |
INR 16400 |
Register Now |
Logistics
|
English |
| RBS121 Aspen Petroleum Scheduler: Building and Using Models (Aspen Orion XT) |
29-Jul-2013 |
02-Aug-2013 |
Houston, TX |
USD 3000 |
Register Now |
Logistics
|
English |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
29-Jul-2013 |
02-Aug-2013 |
Virtual-Americas |
USD 3000 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
30-Jul-2013 |
30-Jul-2013 |
Virtual-Asia Pacific |
SGD 740 |
Register Now |
Logistics
|
English |
| EAP121 Building MS Excel User Interfaces for Aspen Plus Simulations Using Aspen Simulation Workbook |
31-Jul-2013 |
31-Jul-2013 |
Virtual-Latin America |
USD 350 |
Register Now |
Logistics
|
Portuguese |
| EAP121 Building MS Excel User Interfaces for Aspen Plus Simulations Using Aspen Simulation Workbook |
31-Jul-2013 |
31-Jul-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
31-Jul-2013 |
31-Jul-2013 |
Singapore |
SGD 740 |
Register Now |
Logistics
|
English |
| PME122 - Aspen Process Explorer: Using and Configuring |
31-Jul-2013 |
31-Jul-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
01-Aug-2013 |
01-Aug-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EAP2211 Modeling Complex Processes with Equation Oriented Methods |
01-Aug-2013 |
01-Aug-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP2611 Heat Transfer Modeling Using Aspen Plus |
01-Aug-2013 |
01-Aug-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EAP2611 Heat Transfer Modeling Using Aspen Plus |
01-Aug-2013 |
01-Aug-2013 |
Virtual-Latin America |
USD 350 |
Register Now |
Logistics
|
Portuguese |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
01-Aug-2013 |
02-Aug-2013 |
Calgary, AB, Canada |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
01-Aug-2013 |
01-Aug-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
01-Aug-2013 |
01-Aug-2013 |
Virtual-Asia Pacific |
SGD 740 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
01-Aug-2013 |
02-Aug-2013 |
Baton Rouge, LA |
USD 1200 |
Register Now |
Logistics
|
English |
| PME123 Aspen Calc: Using and Configuring |
01-Aug-2013 |
02-Aug-2013 |
Houston, TX |
USD 900 |
Register Now |
Logistics
|
English |
| PME361 Aspen Production Execution Manager: Administration (Aspen eBRS) |
01-Aug-2013 |
02-Aug-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| RPA221 Aspen PIMS: Advanced Optimization Features |
01-Aug-2013 |
02-Aug-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| SLM101 Aspen Software License Management and Deployment |
01-Aug-2013 |
02-Aug-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
02-Aug-2013 |
02-Aug-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EAP321 Aspen Plus: Advanced Topics in Equation Oriented Modeling |
02-Aug-2013 |
02-Aug-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
02-Aug-2013 |
02-Aug-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
02-Aug-2013 |
02-Aug-2013 |
Singapore |
SGD 740 |
Register Now |
Logistics
|
English |
August 5 - August 9, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| APC2300 APC Project Pretesting Using a Virtual Plant |
05-Aug-2013 |
07-Aug-2013 |
|
USD 1800 |
Register Now |
Logistics
|
English |
| APC2900 Process Property Estimator Development and Deployment |
05-Aug-2013 |
07-Aug-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
05-Aug-2013 |
07-Aug-2013 |
Seoul, Korea |
KRW 825000 |
Register Now |
Logistics
|
Korean |
| EAP101 Aspen Plus: Process Modeling |
05-Aug-2013 |
07-Aug-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
05-Aug-2013 |
05-Aug-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP2510 CO2 Removal Processes Using Aspen Plus |
05-Aug-2013 |
07-Aug-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| EAU2831 Introduction to Energy Optimization Using Aspen Utilities Planner |
05-Aug-2013 |
06-Aug-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EEE102 Aspen Process Economic Analyzer (Aspen IPE) |
05-Aug-2013 |
07-Aug-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EEE102 Aspen Process Economic Analyzer (Aspen IPE) |
05-Aug-2013 |
07-Aug-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
05-Aug-2013 |
07-Aug-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
05-Aug-2013 |
07-Aug-2013 |
Virtual-Latin America |
USD 1050 |
Register Now |
Logistics
|
Spanish |
| EHY101 Aspen HYSYS: Process Modeling |
05-Aug-2013 |
07-Aug-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| PME1200 Calculations and Data Analysis for Engineers |
05-Aug-2013 |
07-Aug-2013 |
Virtual-Latin America |
USD 1050 |
Register Now |
Logistics
|
Spanish |
| PME201 Aspen SQLplus for Aspen InfoPlus.21: Using and Configuring for Power Users |
05-Aug-2013 |
09-Aug-2013 |
Virtual-EMEA |
GBP 2000 |
Register Now |
Logistics
|
English |
| PME222 Building Content for Aspen Role Based Visualization (RBV) |
05-Aug-2013 |
07-Aug-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| PME261 Aspen Production Execution Manager: Programming Concepts (Aspen eBRS) |
05-Aug-2013 |
07-Aug-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| RBS131 Aspen Refinery Multi-Blend Optimizer: Blend Planning and Scheduling (Aspen MBO) |
05-Aug-2013 |
06-Aug-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
05-Aug-2013 |
07-Aug-2013 |
Tokyo, Japan |
JPY 129000 |
Register Now |
Logistics
|
Japanese |
| RPA102 Introduction to Aspen PIMS for Petrochemical Planning |
05-Aug-2013 |
08-Aug-2013 |
Virtual-Americas |
USD 2100 |
Register Now |
Logistics
|
English |
| RPA201 Aspen PIMS: Solving Refinery Planning Problems |
05-Aug-2013 |
09-Aug-2013 |
Houston, TX |
USD 3000 |
Register Now |
Logistics
|
English |
| RPA201 Aspen PIMS: Solving Refinery Planning Problems |
05-Aug-2013 |
09-Aug-2013 |
Reading, UK |
GBP 2000 |
Register Now |
Logistics
|
English |
| RPA301 Aspen PIMS: Advanced Refinery Planning Models |
05-Aug-2013 |
09-Aug-2013 |
Houston, TX |
USD 3000 |
Register Now |
Logistics
|
English |
| APC1405 Introduction to APC Using the Advanced Control Platform |
07-Aug-2013 |
09-Aug-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
07-Aug-2013 |
07-Aug-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP2311 Building Custom Simulation Models using Aspen Custom Modeler |
07-Aug-2013 |
09-Aug-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| EHX1100 Modeling Heat Exchangers Using the Exchanger Design and Rating Suite |
07-Aug-2013 |
09-Aug-2013 |
Virtual-EMEA |
GBP 1200 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
08-Aug-2013 |
09-Aug-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
08-Aug-2013 |
09-Aug-2013 |
Seoul, Korea |
KRW 550000 |
Register Now |
Logistics
|
English |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
08-Aug-2013 |
08-Aug-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
08-Aug-2013 |
09-Aug-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
08-Aug-2013 |
09-Aug-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Spanish |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
08-Aug-2013 |
09-Aug-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
08-Aug-2013 |
08-Aug-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
08-Aug-2013 |
08-Aug-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
08-Aug-2013 |
09-Aug-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
08-Aug-2013 |
09-Aug-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| PME231 Aspen Real-Time SPC: Using and Configuring (Aspen Q) |
08-Aug-2013 |
09-Aug-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| PME305 Aspen InfoPlus.21: Advanced System Administration |
08-Aug-2013 |
09-Aug-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
09-Aug-2013 |
09-Aug-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EHX301 Boiling and Reboiling Modeling using Aspen Shell & Tube Exchanger (Aspen Tasc+) |
09-Aug-2013 |
09-Aug-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
09-Aug-2013 |
09-Aug-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
August 12 - August 16, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| APC1020 Advanced Process Control Installing and Configuring |
12-Aug-2013 |
13-Aug-2013 |
Singapore |
SGD 1480 |
Register Now |
Logistics
|
English |
| APC1020 Advanced Process Control Installing and Configuring |
12-Aug-2013 |
13-Aug-2013 |
Virtual-Asia Pacific |
SGD 1480 |
Register Now |
Logistics
|
English |
| APC1400 Introduction to Advanced Process Control using DMCplus |
12-Aug-2013 |
15-Aug-2013 |
Houston, TX |
USD 2400 |
Register Now |
Logistics
|
English |
| APC1400 Introduction to Advanced Process Control using DMCplus |
12-Aug-2013 |
15-Aug-2013 |
Reading, UK |
GBP 1600 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
12-Aug-2013 |
14-Aug-2013 |
Virtual-Latin America |
USD 1050 |
Register Now |
Logistics
|
Spanish |
| EAP101 Aspen Plus: Process Modeling |
12-Aug-2013 |
14-Aug-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
12-Aug-2013 |
14-Aug-2013 |
Las Cruces, NM |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP2311 Building Custom Simulation Models using Aspen Custom Modeler |
12-Aug-2013 |
14-Aug-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EAP2510 CO2 Removal Processes Using Aspen Plus |
12-Aug-2013 |
14-Aug-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP281 Aspen Plus: Process Simulation with Aspen Polymers |
12-Aug-2013 |
14-Aug-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EEE102 Aspen Process Economic Analyzer (Aspen IPE) |
12-Aug-2013 |
14-Aug-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| EHX1100 Modeling Heat Exchangers Using the Exchanger Design and Rating Suite |
12-Aug-2013 |
14-Aug-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
12-Aug-2013 |
14-Aug-2013 |
Calgary, AB, Canada |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
12-Aug-2013 |
14-Aug-2013 |
Aberdeen, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
12-Aug-2013 |
14-Aug-2013 |
Virtual-EMEA |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
12-Aug-2013 |
14-Aug-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| PME1200 Calculations and Data Analysis for Engineers |
12-Aug-2013 |
14-Aug-2013 |
Virtual-EMEA |
GBP 1200 |
Register Now |
Logistics
|
English |
| PME171 Aspen Production Record Manager: Retrieving Batch Data using the Reporting Tools |
12-Aug-2013 |
12-Aug-2013 |
Pune, India |
INR 8200 |
Register Now |
Logistics
|
English |
| PME222 Building Content for Aspen Role Based Visualization (RBV) |
12-Aug-2013 |
14-Aug-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| PME261 Aspen Production Execution Manager: Programming Concepts (Aspen eBRS) |
12-Aug-2013 |
14-Aug-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| RPA100 Essential PIMS Concepts and Economic Analysis for Managers & Economists |
12-Aug-2013 |
13-Aug-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Spanish |
| RPA102 Introduction to Aspen PIMS for Petrochemical Planning |
12-Aug-2013 |
15-Aug-2013 |
Houston, TX |
USD 2100 |
Register Now |
Logistics
|
English |
| RPA151 Aspen Advisor: Operations Reconciliation and Accounting |
12-Aug-2013 |
14-Aug-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| RPA201 Aspen PIMS: Solving Refinery Planning Problems |
12-Aug-2013 |
16-Aug-2013 |
Virtual-Americas |
USD 3000 |
Register Now |
Logistics
|
English |
| RPA301 Aspen PIMS: Advanced Refinery Planning Models |
12-Aug-2013 |
16-Aug-2013 |
Virtual-Americas |
USD 3000 |
Register Now |
Logistics
|
English |
| PME271 Aspen Production Record Manager: Configuring the Batch Area and Feed Application |
13-Aug-2013 |
14-Aug-2013 |
Pune, India |
INR 16400 |
Register Now |
Logistics
|
English |
| EAP2311 Building Custom Simulation Models using Aspen Custom Modeler |
14-Aug-2013 |
16-Aug-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| PME122 - Aspen Process Explorer: Using and Configuring |
14-Aug-2013 |
14-Aug-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| RPA153 Aspen Report Writer for Aspen PIMS |
14-Aug-2013 |
14-Aug-2013 |
Virtual-Asia Pacific |
SGD 740 |
Register Now |
Logistics
|
English |
| EAP121 Building MS Excel User Interfaces for Aspen Plus Simulations Using Aspen Simulation Workbook |
15-Aug-2013 |
15-Aug-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP121 Building MS Excel User Interfaces for Aspen Plus Simulations Using Aspen Simulation Workbook |
15-Aug-2013 |
15-Aug-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
15-Aug-2013 |
16-Aug-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Spanish |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
15-Aug-2013 |
16-Aug-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
15-Aug-2013 |
16-Aug-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
15-Aug-2013 |
16-Aug-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
15-Aug-2013 |
16-Aug-2013 |
Aberdeen, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
15-Aug-2013 |
16-Aug-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
15-Aug-2013 |
16-Aug-2013 |
Calgary, AB, Canada |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
15-Aug-2013 |
16-Aug-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
15-Aug-2013 |
16-Aug-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| PME123 Aspen Calc: Using and Configuring |
15-Aug-2013 |
16-Aug-2013 |
Virtual-EMEA |
GBP 600 |
Register Now |
Logistics
|
English |
| PME231 Aspen Real-Time SPC: Using and Configuring (Aspen Q) |
15-Aug-2013 |
16-Aug-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| PME305 Aspen InfoPlus.21: Advanced System Administration |
15-Aug-2013 |
16-Aug-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| RPA221 Aspen PIMS: Advanced Optimization Features |
15-Aug-2013 |
16-Aug-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| RPA221 Aspen PIMS: Advanced Optimization Features |
15-Aug-2013 |
16-Aug-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
16-Aug-2013 |
16-Aug-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
16-Aug-2013 |
16-Aug-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
August 19 - August 23, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| EAP101 Aspen Plus: Process Modeling |
19-Aug-2013 |
21-Aug-2013 |
Virtual-EMEA |
GBP 1200 |
Register Now |
Logistics
|
English |
| EAP281 Aspen Plus: Process Simulation with Aspen Polymers |
19-Aug-2013 |
21-Aug-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP301 Aspen Plus: Real Time Modeling and Optimization |
19-Aug-2013 |
22-Aug-2013 |
Reading, UK |
GBP 1600 |
Register Now |
Logistics
|
English |
| EEE103 Aspen In-Plant Cost Estimator (Aspen IPM) |
19-Aug-2013 |
21-Aug-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
19-Aug-2013 |
19-Aug-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
19-Aug-2013 |
21-Aug-2013 |
Calgary, AB, Canada |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
19-Aug-2013 |
21-Aug-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
19-Aug-2013 |
21-Aug-2013 |
Virtual-EMEA |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
19-Aug-2013 |
20-Aug-2013 |
Aberdeen, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
19-Aug-2013 |
23-Aug-2013 |
Virtual-EMEA |
GBP 2000 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
19-Aug-2013 |
23-Aug-2013 |
Reading, UK |
GBP 2000 |
Register Now |
Logistics
|
English |
| PME141 Aspen IP.21 Process Browser (Web.21): User Training |
19-Aug-2013 |
19-Aug-2013 |
Pune, India |
INR 8200 |
Register Now |
Logistics
|
English |
| PME311 Aspen InfoPlus.21: Applications Development |
19-Aug-2013 |
23-Aug-2013 |
Virtual-Latin America |
USD 1750 |
Register Now |
Logistics
|
Spanish |
| RBS131 Aspen Refinery Multi-Blend Optimizer: Blend Planning and Scheduling (Aspen MBO) |
19-Aug-2013 |
20-Aug-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
19-Aug-2013 |
23-Aug-2013 |
Virtual-Latin America |
USD 1750 |
Register Now |
Logistics
|
Spanish |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
19-Aug-2013 |
23-Aug-2013 |
Virtual-EMEA |
GBP 2000 |
Register Now |
Logistics
|
English |
| RPA201 Aspen PIMS: Solving Refinery Planning Problems |
19-Aug-2013 |
23-Aug-2013 |
Beijing, China |
USD 1500 |
Register Now |
Logistics
|
Chinese |
| PME241 Aspen IP.21 Process Browser (Web.21): Configuring |
20-Aug-2013 |
21-Aug-2013 |
Pune, India |
INR 16400 |
Register Now |
Logistics
|
English |
| EEE102 Aspen Process Economic Analyzer (Aspen IPE) |
21-Aug-2013 |
23-Aug-2013 |
Tokyo, Japan |
JPY 129000 |
Register Now |
Logistics
|
Japanese |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
21-Aug-2013 |
22-Aug-2013 |
Aberdeen, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EHX1021 Design and Rate Air Cooled Heat Exchangers |
21-Aug-2013 |
21-Aug-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
21-Aug-2013 |
21-Aug-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY2102 Aspen HYSYS Petroleum Refining: Process Modeling and Optimization for Refinery Unit Operations |
21-Aug-2013 |
23-Aug-2013 |
Virtual-Asia Pacific |
SGD 2220 |
Register Now |
Logistics
|
English |
| EHY2102 Aspen HYSYS Petroleum Refining: Process Modeling and Optimization for Refinery Unit Operations |
21-Aug-2013 |
23-Aug-2013 |
Singapore |
SGD 2220 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
21-Aug-2013 |
23-Aug-2013 |
Virtual-Latin America |
USD 1050 |
Register Now |
Logistics
|
Spanish |
| RPA151 Aspen Advisor: Operations Reconciliation and Accounting |
21-Aug-2013 |
23-Aug-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP121 Building MS Excel User Interfaces for Aspen Plus Simulations Using Aspen Simulation Workbook |
22-Aug-2013 |
22-Aug-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
22-Aug-2013 |
23-Aug-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
22-Aug-2013 |
23-Aug-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
22-Aug-2013 |
23-Aug-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
22-Aug-2013 |
23-Aug-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Spanish |
| EHX1031 Design and Simulation of Fired Heaters Using Aspen Fired Heater |
22-Aug-2013 |
22-Aug-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
22-Aug-2013 |
22-Aug-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
22-Aug-2013 |
23-Aug-2013 |
Calgary, AB, Canada |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
22-Aug-2013 |
23-Aug-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EOP171 Develop and Implement Operator Training Simulator (OTS) using Aspen OTS |
22-Aug-2013 |
23-Aug-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| PME122 - Aspen Process Explorer: Using and Configuring |
22-Aug-2013 |
22-Aug-2013 |
Pune, India |
INR 8200 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
23-Aug-2013 |
23-Aug-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EAP2911 Solids Modeling Using Aspen Plus |
23-Aug-2013 |
23-Aug-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
23-Aug-2013 |
23-Aug-2013 |
Aberdeen, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
23-Aug-2013 |
23-Aug-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EOP161 Introduction to Aspen Online Deployment for Performance Monitoring of Critical Plant Equipment |
23-Aug-2013 |
23-Aug-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| PME123 Aspen Calc: Using and Configuring |
23-Aug-2013 |
24-Aug-2013 |
Pune, India |
INR 12300 |
Register Now |
Logistics
|
English |
August 26 - August 30, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| EAP101 Aspen Plus: Process Modeling |
26-Aug-2013 |
28-Aug-2013 |
Denver, CO |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
26-Aug-2013 |
28-Aug-2013 |
Beijing, China |
USD 900 |
Register Now |
Logistics
|
Chinese |
| EAP281 Aspen Plus: Process Simulation with Aspen Polymers |
26-Aug-2013 |
28-Aug-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP301 Aspen Plus: Real Time Modeling and Optimization |
26-Aug-2013 |
29-Aug-2013 |
Virtual-Americas |
USD 2400 |
Register Now |
Logistics
|
English |
| EEE1011 Introduction to Aspen Capital Cost Estimator |
26-Aug-2013 |
29-Aug-2013 |
Calgary, AB, Canada |
USD 2400 |
Register Now |
Logistics
|
English |
| EEE103 Aspen In-Plant Cost Estimator (Aspen IPM) |
26-Aug-2013 |
28-Aug-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
26-Aug-2013 |
28-Aug-2013 |
Singapore |
SGD 2220 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
26-Aug-2013 |
28-Aug-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
26-Aug-2013 |
30-Aug-2013 |
Virtual-Latin America |
USD 1750 |
Register Now |
Logistics
|
Spanish |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
26-Aug-2013 |
30-Aug-2013 |
Virtual-Americas |
USD 3000 |
Register Now |
Logistics
|
English |
| RBS131 Aspen Refinery Multi-Blend Optimizer: Blend Planning and Scheduling (Aspen MBO) |
26-Aug-2013 |
27-Aug-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
26-Aug-2013 |
30-Aug-2013 |
Virtual-Americas |
USD 3000 |
Register Now |
Logistics
|
English |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
26-Aug-2013 |
30-Aug-2013 |
Virtual-Americas |
USD 3000 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
27-Aug-2013 |
29-Aug-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY2312 Create Custom Unit Operations and Kinetic Model Extensions using VB 6.0 for Aspen HYSYS |
27-Aug-2013 |
28-Aug-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| PME305 Aspen InfoPlus.21: Advanced System Administration |
27-Aug-2013 |
28-Aug-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EAP2911 Solids Modeling Using Aspen Plus |
28-Aug-2013 |
28-Aug-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHX2911 Improved Energy Efficiency through Heat Integration |
28-Aug-2013 |
30-Aug-2013 |
Tokyo, Japan |
JPY 129000 |
Register Now |
Logistics
|
Japanese |
| RPA151 Aspen Advisor: Operations Reconciliation and Accounting |
28-Aug-2013 |
30-Aug-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
29-Aug-2013 |
30-Aug-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
29-Aug-2013 |
30-Aug-2013 |
Denver, CO |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
29-Aug-2013 |
30-Aug-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Spanish |
| EAP250 Aspen Plus: Distillation Modeling |
29-Aug-2013 |
30-Aug-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
29-Aug-2013 |
30-Aug-2013 |
Beijing, China |
USD 600 |
Register Now |
Logistics
|
Chinese |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
29-Aug-2013 |
30-Aug-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
29-Aug-2013 |
29-Aug-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
29-Aug-2013 |
30-Aug-2013 |
Singapore |
SGD 1480 |
Register Now |
Logistics
|
English |
| PME305 Aspen InfoPlus.21: Advanced System Administration |
29-Aug-2013 |
30-Aug-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EAP121 Building MS Excel User Interfaces for Aspen Plus Simulations Using Aspen Simulation Workbook |
30-Aug-2013 |
30-Aug-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
30-Aug-2013 |
30-Aug-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
30-Aug-2013 |
30-Aug-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
30-Aug-2013 |
30-Aug-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
30-Aug-2013 |
30-Aug-2013 |
Calgary, AB, Canada |
USD 600 |
Register Now |
Logistics
|
English |
September 2 - September 6, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| APC2600 Advanced Process Control Performance Monitoring |
02-Sep-2013 |
04-Sep-2013 |
Singapore |
SGD 2220 |
Register Now |
Logistics
|
English |
| APC2600 Advanced Process Control Performance Monitoring |
02-Sep-2013 |
04-Sep-2013 |
Virtual-Asia Pacific |
SGD 2220 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
02-Sep-2013 |
04-Sep-2013 |
Tokyo, Japan |
JPY 129000 |
Register Now |
Logistics
|
Japanese |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
02-Sep-2013 |
03-Sep-2013 |
Beijing, China |
USD 600 |
Register Now |
Logistics
|
Chinese |
| EEE1011 Introduction to Aspen Capital Cost Estimator |
02-Sep-2013 |
05-Sep-2013 |
Reading, UK |
GBP 1600 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
02-Sep-2013 |
04-Sep-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| PME201 Aspen SQLplus for Aspen InfoPlus.21: Using and Configuring for Power Users |
02-Sep-2013 |
06-Sep-2013 |
Reading, UK |
GBP 2000 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
03-Sep-2013 |
03-Sep-2013 |
Virtual-Asia Pacific |
SGD 740 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
04-Sep-2013 |
04-Sep-2013 |
Singapore |
SGD 740 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
05-Sep-2013 |
06-Sep-2013 |
Tokyo, Japan |
JPY 86000 |
Register Now |
Logistics
|
Japanese |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
05-Sep-2013 |
05-Sep-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
05-Sep-2013 |
06-Sep-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
05-Sep-2013 |
05-Sep-2013 |
Virtual-Asia Pacific |
SGD 740 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
05-Sep-2013 |
05-Sep-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
06-Sep-2013 |
06-Sep-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
06-Sep-2013 |
06-Sep-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
06-Sep-2013 |
06-Sep-2013 |
Singapore |
SGD 740 |
Register Now |
Logistics
|
English |
September 9 - September 13, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| EAP101 Aspen Plus: Process Modeling |
09-Sep-2013 |
11-Sep-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
09-Sep-2013 |
09-Sep-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
09-Sep-2013 |
10-Sep-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EEE1011 Introduction to Aspen Capital Cost Estimator |
09-Sep-2013 |
12-Sep-2013 |
Houston, TX |
USD 2400 |
Register Now |
Logistics
|
English |
| EEE1011 Introduction to Aspen Capital Cost Estimator |
09-Sep-2013 |
12-Sep-2013 |
Virtual-EMEA |
GBP 1600 |
Register Now |
Logistics
|
English |
| EEE103 Aspen In-Plant Cost Estimator (Aspen IPM) |
09-Sep-2013 |
11-Sep-2013 |
Calgary, AB, Canada |
USD 1800 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
09-Sep-2013 |
10-Sep-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
09-Sep-2013 |
11-Sep-2013 |
Philadelphia, PA |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
09-Sep-2013 |
11-Sep-2013 |
Milan, Italy |
EUR 1560 |
Register Now |
Logistics
|
Italian |
| EHY101 Aspen HYSYS: Process Modeling |
09-Sep-2013 |
11-Sep-2013 |
Virtual-Latin America |
USD 1050 |
Register Now |
Logistics
|
Portuguese |
| EHY101 Aspen HYSYS: Process Modeling |
09-Sep-2013 |
11-Sep-2013 |
Denver, CO |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
09-Sep-2013 |
11-Sep-2013 |
Stavanger, Norway |
EUR 2400 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
09-Sep-2013 |
11-Sep-2013 |
Anchorage, AK |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
09-Sep-2013 |
11-Sep-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
09-Sep-2013 |
11-Sep-2013 |
Virtual-EMEA |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
09-Sep-2013 |
10-Sep-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| PME141 Aspen IP.21 Process Browser (Web.21): User Training |
09-Sep-2013 |
09-Sep-2013 |
Singapore |
SGD 740 |
Register Now |
Logistics
|
English |
| PME141 Aspen IP.21 Process Browser (Web.21): User Training |
09-Sep-2013 |
09-Sep-2013 |
Virtual-Asia Pacific |
SGD 740 |
Register Now |
Logistics
|
English |
| PME141 Aspen IP.21 Process Browser (Web.21): User Training |
09-Sep-2013 |
09-Sep-2013 |
Virtual-India |
INR 8200 |
Register Now |
Logistics
|
English |
| PME201 Aspen SQLplus for Aspen InfoPlus.21: Using and Configuring for Power Users |
09-Sep-2013 |
13-Sep-2013 |
Houston, TX |
USD 3000 |
Register Now |
Logistics
|
English |
| PME311 Aspen InfoPlus.21: Applications Development |
09-Sep-2013 |
13-Sep-2013 |
Virtual-Americas |
USD 3000 |
Register Now |
Logistics
|
English |
| RPA100 Essential PIMS Concepts and Economic Analysis for Managers & Economists |
09-Sep-2013 |
10-Sep-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Spanish |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
10-Sep-2013 |
11-Sep-2013 |
Beijing, China |
USD 600 |
Register Now |
Logistics
|
English |
| PME241 Aspen IP.21 Process Browser (Web.21): Configuring |
10-Sep-2013 |
11-Sep-2013 |
Singapore |
SGD 1480 |
Register Now |
Logistics
|
English |
| PME241 Aspen IP.21 Process Browser (Web.21): Configuring |
10-Sep-2013 |
11-Sep-2013 |
Virtual-Asia Pacific |
SGD 1480 |
Register Now |
Logistics
|
English |
| APC2400 Advanced Process Control Application Development and Online Deployment |
11-Sep-2013 |
12-Sep-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP121 Building MS Excel User Interfaces for Aspen Plus Simulations Using Aspen Simulation Workbook |
11-Sep-2013 |
11-Sep-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
11-Sep-2013 |
11-Sep-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EHX1041 Introduction to Aspen Plate Fin Exchanger |
11-Sep-2013 |
11-Sep-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EHY2351 Modeling Heavy Oil & Gas Production and Facilities Using Aspen HYSYS Upstream |
11-Sep-2013 |
12-Sep-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| PME122 - Aspen Process Explorer: Using and Configuring |
11-Sep-2013 |
11-Sep-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
12-Sep-2013 |
13-Sep-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
12-Sep-2013 |
12-Sep-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EAP2611 Heat Transfer Modeling Using Aspen Plus |
12-Sep-2013 |
12-Sep-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
12-Sep-2013 |
13-Sep-2013 |
Calgary, AB, Canada |
USD 1200 |
Register Now |
Logistics
|
English |
| EHX2911 Improved Energy Efficiency through Heat Integration |
12-Sep-2013 |
13-Sep-2013 |
Beijing, China |
USD 600 |
Register Now |
Logistics
|
Chinese |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
12-Sep-2013 |
13-Sep-2013 |
Milan, Italy |
EUR 1040 |
Register Now |
Logistics
|
Italian |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
12-Sep-2013 |
13-Sep-2013 |
Denver, CO |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
12-Sep-2013 |
13-Sep-2013 |
Anchorage, AK |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
12-Sep-2013 |
13-Sep-2013 |
Philadelphia, PA |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
12-Sep-2013 |
13-Sep-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
12-Sep-2013 |
13-Sep-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Portuguese |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
12-Sep-2013 |
13-Sep-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
12-Sep-2013 |
12-Sep-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
12-Sep-2013 |
13-Sep-2013 |
Stavanger, Norway |
EUR 1600 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
12-Sep-2013 |
13-Sep-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| PME122 - Aspen Process Explorer: Using and Configuring |
12-Sep-2013 |
12-Sep-2013 |
Virtual-Asia Pacific |
SGD 740 |
Register Now |
Logistics
|
English |
| PME122 - Aspen Process Explorer: Using and Configuring |
12-Sep-2013 |
12-Sep-2013 |
Singapore |
SGD 740 |
Register Now |
Logistics
|
English |
| PME123 Aspen Calc: Using and Configuring |
12-Sep-2013 |
13-Sep-2013 |
Reading, UK |
GBP 600 |
Register Now |
Logistics
|
English |
| EAP2121 Process Flowsheet Convergence in Aspen Plus |
13-Sep-2013 |
13-Sep-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| PME123 Aspen Calc: Using and Configuring |
13-Sep-2013 |
14-Sep-2013 |
Singapore |
SGD 1110 |
Register Now |
Logistics
|
English |
| PME123 Aspen Calc: Using and Configuring |
13-Sep-2013 |
14-Sep-2013 |
Virtual-Asia Pacific |
SGD 900 |
Register Now |
Logistics
|
English |
September 16 - September 20, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| EAP101 Aspen Plus: Process Modeling |
16-Sep-2013 |
18-Sep-2013 |
Virtual-Latin America |
USD 1050 |
Register Now |
Logistics
|
Portuguese |
| EAP101 Aspen Plus: Process Modeling |
16-Sep-2013 |
18-Sep-2013 |
Virtual-EMEA |
GBP 1200 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
16-Sep-2013 |
18-Sep-2013 |
Chicago, IL |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
16-Sep-2013 |
18-Sep-2013 |
Frankfurt, Germany |
EUR 1560 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
16-Sep-2013 |
18-Sep-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
16-Sep-2013 |
16-Sep-2013 |
Wilmington, DE |
USD 600 |
Register Now |
Logistics
|
English |
| EAP2411 Improved Process Operability and Control through Aspen Plus Dynamic Models |
16-Sep-2013 |
18-Sep-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
16-Sep-2013 |
17-Sep-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EEE1011 Introduction to Aspen Capital Cost Estimator |
16-Sep-2013 |
19-Sep-2013 |
Virtual-Americas |
USD 2400 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
16-Sep-2013 |
17-Sep-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
16-Sep-2013 |
17-Sep-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
16-Sep-2013 |
18-Sep-2013 |
Copenhagen, Denmark |
EUR 1560 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
16-Sep-2013 |
18-Sep-2013 |
Brisbane, Australia |
AUD 1980 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
16-Sep-2013 |
18-Sep-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
16-Sep-2013 |
18-Sep-2013 |
Calgary, AB, Canada |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
16-Sep-2013 |
16-Sep-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY2102 Aspen HYSYS Petroleum Refining: Process Modeling and Optimization for Refinery Unit Operations |
16-Sep-2013 |
18-Sep-2013 |
Virtual-EMEA |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY2102 Aspen HYSYS Petroleum Refining: Process Modeling and Optimization for Refinery Unit Operations |
16-Sep-2013 |
18-Sep-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
16-Sep-2013 |
18-Sep-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
16-Sep-2013 |
18-Sep-2013 |
Anchorage, AK |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
16-Sep-2013 |
17-Sep-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| PME201 Aspen SQLplus for Aspen InfoPlus.21: Using and Configuring for Power Users |
16-Sep-2013 |
20-Sep-2013 |
Virtual-Americas |
USD 3000 |
Register Now |
Logistics
|
English |
| PME311 Aspen InfoPlus.21: Applications Development |
16-Sep-2013 |
20-Sep-2013 |
Houston, TX |
USD 3000 |
Register Now |
Logistics
|
English |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
16-Sep-2013 |
20-Sep-2013 |
Virtual-Latin America |
USD 1750 |
Register Now |
Logistics
|
Spanish |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
16-Sep-2013 |
20-Sep-2013 |
Reading, UK |
GBP 2000 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
17-Sep-2013 |
18-Sep-2013 |
Wilmington, DE |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP121 Building MS Excel User Interfaces for Aspen Plus Simulations Using Aspen Simulation Workbook |
18-Sep-2013 |
18-Sep-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EHX1041 Introduction to Aspen Plate Fin Exchanger |
18-Sep-2013 |
18-Sep-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHX1041 Introduction to Aspen Plate Fin Exchanger |
18-Sep-2013 |
18-Sep-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
18-Sep-2013 |
18-Sep-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
19-Sep-2013 |
20-Sep-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Portuguese |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
19-Sep-2013 |
20-Sep-2013 |
Frankfurt, Germany |
EUR 1040 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
19-Sep-2013 |
20-Sep-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
19-Sep-2013 |
20-Sep-2013 |
Chicago, IL |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
19-Sep-2013 |
20-Sep-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP2121 Process Flowsheet Convergence in Aspen Plus |
19-Sep-2013 |
19-Sep-2013 |
Wilmington, DE |
USD 600 |
Register Now |
Logistics
|
English |
| EHX131 Heat Exchanger Mechanical Design using Aspen Shell & Tube Mechanical (Aspen Teams) |
19-Sep-2013 |
19-Sep-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHX131 Heat Exchanger Mechanical Design using Aspen Shell & Tube Mechanical (Aspen Teams) |
19-Sep-2013 |
19-Sep-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
19-Sep-2013 |
19-Sep-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
19-Sep-2013 |
20-Sep-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
19-Sep-2013 |
20-Sep-2013 |
Copenhagen, Denmark |
EUR 1040 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
19-Sep-2013 |
20-Sep-2013 |
Calgary, AB, Canada |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
19-Sep-2013 |
20-Sep-2013 |
Brisbane, Australia |
AUD 1320 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
19-Sep-2013 |
20-Sep-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
19-Sep-2013 |
20-Sep-2013 |
Anchorage, AK |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY2611 Heat Transfer Modeling Using Aspen HYSYS |
19-Sep-2013 |
19-Sep-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
20-Sep-2013 |
20-Sep-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP2121 Process Flowsheet Convergence in Aspen Plus |
20-Sep-2013 |
20-Sep-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EEE1011 Introduction to Aspen Capital Cost Estimator |
22-Sep-2013 |
25-Sep-2013 |
Dubai, UAE |
USD 2600 |
Register Now |
Logistics
|
English |
September 23 - September 27, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| APC2600 Advanced Process Control Performance Monitoring |
23-Sep-2013 |
25-Sep-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
23-Sep-2013 |
25-Sep-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
23-Sep-2013 |
25-Sep-2013 |
Wilmington, DE |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
23-Sep-2013 |
25-Sep-2013 |
Milan, Italy |
EUR 1560 |
Register Now |
Logistics
|
Italian |
| EAP2311 Building Custom Simulation Models using Aspen Custom Modeler |
23-Sep-2013 |
25-Sep-2013 |
Frankfurt, Germany |
EUR 1560 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
23-Sep-2013 |
24-Sep-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
23-Sep-2013 |
25-Sep-2013 |
Chicago, IL |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
23-Sep-2013 |
25-Sep-2013 |
Copenhagen, Denmark |
EUR 1560 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
23-Sep-2013 |
25-Sep-2013 |
Virtual-EMEA |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
23-Sep-2013 |
25-Sep-2013 |
Virtual-Latin America |
USD 1050 |
Register Now |
Logistics
|
Portuguese |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
23-Sep-2013 |
25-Sep-2013 |
Brisbane, Australia |
AUD 1980 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
23-Sep-2013 |
25-Sep-2013 |
Calgary, AB, Canada |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
23-Sep-2013 |
25-Sep-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY2351 Modeling Heavy Oil & Gas Production and Facilities Using Aspen HYSYS Upstream |
23-Sep-2013 |
24-Sep-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
23-Sep-2013 |
27-Sep-2013 |
Houston, TX |
USD 3000 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
23-Sep-2013 |
27-Sep-2013 |
Reading, UK |
GBP 2000 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
23-Sep-2013 |
27-Sep-2013 |
Virtual-Latin America |
USD 1750 |
Register Now |
Logistics
|
Spanish |
| RBS121 Aspen Petroleum Scheduler: Building and Using Models (Aspen Orion XT) |
23-Sep-2013 |
27-Sep-2013 |
Virtual-Americas |
USD 3000 |
Register Now |
Logistics
|
English |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
23-Sep-2013 |
27-Sep-2013 |
Virtual-EMEA |
GBP 2000 |
Register Now |
Logistics
|
English |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
23-Sep-2013 |
27-Sep-2013 |
Houston, TX |
USD 3000 |
Register Now |
Logistics
|
English |
| RPA201 Aspen PIMS: Solving Refinery Planning Problems |
23-Sep-2013 |
27-Sep-2013 |
Pune, India |
INR 41000 |
Register Now |
Logistics
|
English |
| EEE1011 Introduction to Aspen Capital Cost Estimator |
24-Sep-2013 |
27-Sep-2013 |
Singapore |
SGD 2960 |
Register Now |
Logistics
|
English |
| EAP121 Building MS Excel User Interfaces for Aspen Plus Simulations Using Aspen Simulation Workbook |
25-Sep-2013 |
25-Sep-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EAP2311 Building Custom Simulation Models using Aspen Custom Modeler |
25-Sep-2013 |
27-Sep-2013 |
Tokyo, Japan |
JPY 129000 |
Register Now |
Logistics
|
Japanese |
| EAP2411 Improved Process Operability and Control through Aspen Plus Dynamic Models |
25-Sep-2013 |
27-Sep-2013 |
Tokyo, Japan |
JPY 129000 |
Register Now |
Logistics
|
Japanese |
| PME122 - Aspen Process Explorer: Using and Configuring |
25-Sep-2013 |
25-Sep-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
26-Sep-2013 |
27-Sep-2013 |
Milan, Italy |
EUR 1040 |
Register Now |
Logistics
|
Italian |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
26-Sep-2013 |
27-Sep-2013 |
Wilmington, DE |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
26-Sep-2013 |
27-Sep-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EAP2611 Heat Transfer Modeling Using Aspen Plus |
26-Sep-2013 |
26-Sep-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EAP2980 Simulation of Electrolyte Processes With Aspen Plus |
26-Sep-2013 |
27-Sep-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
26-Sep-2013 |
27-Sep-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
26-Sep-2013 |
27-Sep-2013 |
Frankfurt, Germany |
EUR 1040 |
Register Now |
Logistics
|
English |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
26-Sep-2013 |
26-Sep-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
26-Sep-2013 |
26-Sep-2013 |
Virtual-Latin America |
USD 350 |
Register Now |
Logistics
|
Portuguese |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
26-Sep-2013 |
27-Sep-2013 |
Chicago, IL |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
26-Sep-2013 |
26-Sep-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY2351 Modeling Heavy Oil & Gas Production and Facilities Using Aspen HYSYS Upstream |
26-Sep-2013 |
27-Sep-2013 |
Brisbane, Australia |
AUD 1320 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
26-Sep-2013 |
27-Sep-2013 |
Copenhagen, Denmark |
EUR 1040 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
26-Sep-2013 |
27-Sep-2013 |
Calgary, AB, Canada |
USD 1200 |
Register Now |
Logistics
|
English |
| PME123 Aspen Calc: Using and Configuring |
26-Sep-2013 |
27-Sep-2013 |
Virtual-Americas |
USD 900 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
27-Sep-2013 |
27-Sep-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
27-Sep-2013 |
27-Sep-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
27-Sep-2013 |
27-Sep-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP2911 Solids Modeling Using Aspen Plus |
27-Sep-2013 |
27-Sep-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
27-Sep-2013 |
27-Sep-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
27-Sep-2013 |
27-Sep-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
27-Sep-2013 |
27-Sep-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| RPA153 Aspen Report Writer for Aspen PIMS |
27-Sep-2013 |
27-Sep-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EEE102 Aspen Process Economic Analyzer (Aspen IPE) |
29-Sep-2013 |
01-Oct-2013 |
Dubai, UAE |
USD 1950 |
Register Now |
Logistics
|
English |
September 30 - October 4, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| APC2900 Process Property Estimator Development and Deployment |
30-Sep-2013 |
02-Oct-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
30-Sep-2013 |
02-Oct-2013 |
Singapore |
SGD 2220 |
Register Now |
Logistics
|
English |
| EAP2411 Improved Process Operability and Control through Aspen Plus Dynamic Models |
30-Sep-2013 |
02-Oct-2013 |
Chicago, IL |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
30-Sep-2013 |
01-Oct-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Portuguese |
| EAP250 Aspen Plus: Distillation Modeling |
30-Sep-2013 |
01-Oct-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP2911 Solids Modeling Using Aspen Plus |
30-Sep-2013 |
30-Sep-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EEE1011 Introduction to Aspen Capital Cost Estimator |
30-Sep-2013 |
03-Oct-2013 |
Calgary, AB, Canada |
USD 2400 |
Register Now |
Logistics
|
English |
| EEE102 Aspen Process Economic Analyzer (Aspen IPE) |
30-Sep-2013 |
02-Oct-2013 |
Virtual-EMEA |
GBP 1200 |
Register Now |
Logistics
|
English |
| EEE102 Aspen Process Economic Analyzer (Aspen IPE) |
30-Sep-2013 |
02-Oct-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
30-Sep-2013 |
02-Oct-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
30-Sep-2013 |
02-Oct-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY2102 Aspen HYSYS Petroleum Refining: Process Modeling and Optimization for Refinery Unit Operations |
30-Sep-2013 |
02-Oct-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
30-Sep-2013 |
02-Oct-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
30-Sep-2013 |
04-Oct-2013 |
Virtual-Americas |
USD 3000 |
Register Now |
Logistics
|
English |
| PME305 Aspen InfoPlus.21: Advanced System Administration |
30-Sep-2013 |
01-Oct-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Spanish |
| RBS121 Aspen Petroleum Scheduler: Building and Using Models (Aspen Orion XT) |
30-Sep-2013 |
04-Oct-2013 |
Houston, TX |
USD 3000 |
Register Now |
Logistics
|
English |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
30-Sep-2013 |
04-Oct-2013 |
Virtual-Americas |
USD 3000 |
Register Now |
Logistics
|
English |
| RPA301 Aspen PIMS: Advanced Refinery Planning Models |
30-Sep-2013 |
04-Oct-2013 |
Reading, UK |
GBP 2000 |
Register Now |
Logistics
|
English |
| APC2400 Advanced Process Control Application Development and Online Deployment |
02-Oct-2013 |
04-Oct-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EAP121 Building MS Excel User Interfaces for Aspen Plus Simulations Using Aspen Simulation Workbook |
02-Oct-2013 |
02-Oct-2013 |
Virtual-Latin America |
USD 350 |
Register Now |
Logistics
|
Portuguese |
| EAP121 Building MS Excel User Interfaces for Aspen Plus Simulations Using Aspen Simulation Workbook |
02-Oct-2013 |
02-Oct-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| PME122 - Aspen Process Explorer: Using and Configuring |
02-Oct-2013 |
02-Oct-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
03-Oct-2013 |
04-Oct-2013 |
Virtual-Asia Pacific |
SGD 148 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
03-Oct-2013 |
04-Oct-2013 |
Chicago, IL |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
03-Oct-2013 |
04-Oct-2013 |
Singapore |
SGD 1480 |
Register Now |
Logistics
|
English |
| EAP2611 Heat Transfer Modeling Using Aspen Plus |
03-Oct-2013 |
03-Oct-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EAP2611 Heat Transfer Modeling Using Aspen Plus |
03-Oct-2013 |
03-Oct-2013 |
Virtual-Latin America |
USD 350 |
Register Now |
Logistics
|
Portuguese |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
03-Oct-2013 |
03-Oct-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
03-Oct-2013 |
04-Oct-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
03-Oct-2013 |
03-Oct-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| PME123 Aspen Calc: Using and Configuring |
03-Oct-2013 |
04-Oct-2013 |
Houston, TX |
USD 900 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
04-Oct-2013 |
04-Oct-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
04-Oct-2013 |
04-Oct-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
04-Oct-2013 |
04-Oct-2013 |
Calgary, AB, Canada |
USD 600 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
04-Oct-2013 |
04-Oct-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
04-Oct-2013 |
04-Oct-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
October 7 - October 11, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| APC2400 Advanced Process Control Application Development and Online Deployment |
07-Oct-2013 |
08-Oct-2013 |
Pune, India |
INR 16400 |
Register Now |
Logistics
|
English |
| APC2900 Process Property Estimator Development and Deployment |
07-Oct-2013 |
09-Oct-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
07-Oct-2013 |
09-Oct-2013 |
Brussels, Belgium |
EUR 1560 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
07-Oct-2013 |
09-Oct-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
07-Oct-2013 |
08-Oct-2013 |
Virtual-Asia Pacific |
SGD 1480 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
07-Oct-2013 |
08-Oct-2013 |
Singapore |
SGD 1480 |
Register Now |
Logistics
|
English |
| EAP301 Aspen Plus: Real Time Modeling and Optimization |
07-Oct-2013 |
10-Oct-2013 |
Virtual-EMEA |
GBP 1600 |
Register Now |
Logistics
|
English |
| EEE102 Aspen Process Economic Analyzer (Aspen IPE) |
07-Oct-2013 |
09-Oct-2013 |
Calgary, AB, Canada |
USD 1800 |
Register Now |
Logistics
|
English |
| EEE102 Aspen Process Economic Analyzer (Aspen IPE) |
07-Oct-2013 |
09-Oct-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EEE103 Aspen In-Plant Cost Estimator (Aspen IPM) |
07-Oct-2013 |
09-Oct-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
07-Oct-2013 |
09-Oct-2013 |
Virtual-Latin America |
USD 1050 |
Register Now |
Logistics
|
Spanish |
| EHY101 Aspen HYSYS: Process Modeling |
07-Oct-2013 |
09-Oct-2013 |
Virtual-EMEA |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY2102 Aspen HYSYS Petroleum Refining: Process Modeling and Optimization for Refinery Unit Operations |
07-Oct-2013 |
09-Oct-2013 |
Virtual-EMEA |
GBP 1200 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
07-Oct-2013 |
11-Oct-2013 |
Beijing, China |
USD 1500 |
Register Now |
Logistics
|
Chinese |
| PME1200 Calculations and Data Analysis for Engineers |
07-Oct-2013 |
09-Oct-2013 |
Virtual-Latin America |
USD 1050 |
Register Now |
Logistics
|
Spanish |
| PME222 Building Content for Aspen Role Based Visualization (RBV) |
07-Oct-2013 |
09-Oct-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| PME261 Aspen Production Execution Manager: Programming Concepts (Aspen eBRS) |
07-Oct-2013 |
09-Oct-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| RPA102 Introduction to Aspen PIMS for Petrochemical Planning |
07-Oct-2013 |
10-Oct-2013 |
Virtual-Americas |
USD 2100 |
Register Now |
Logistics
|
English |
| RPA201 Aspen PIMS: Solving Refinery Planning Problems |
07-Oct-2013 |
11-Oct-2013 |
Houston, TX |
USD 3000 |
Register Now |
Logistics
|
English |
| RPA301 Aspen PIMS: Advanced Refinery Planning Models |
07-Oct-2013 |
11-Oct-2013 |
Houston, TX |
USD 3000 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
08-Oct-2013 |
09-Oct-2013 |
Perth, Australia |
AUD 1320 |
Register Now |
Logistics
|
English |
| EAP121 Building MS Excel User Interfaces for Aspen Plus Simulations Using Aspen Simulation Workbook |
09-Oct-2013 |
09-Oct-2013 |
Virtual-Asia Pacific |
SGD 740 |
Register Now |
Logistics
|
English |
| EAP121 Building MS Excel User Interfaces for Aspen Plus Simulations Using Aspen Simulation Workbook |
09-Oct-2013 |
09-Oct-2013 |
Singapore |
SGD 740 |
Register Now |
Logistics
|
English |
| EHY2351 Modeling Heavy Oil & Gas Production and Facilities Using Aspen HYSYS Upstream |
09-Oct-2013 |
10-Oct-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
10-Oct-2013 |
11-Oct-2013 |
Brussels, Belgium |
EUR 1040 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
10-Oct-2013 |
11-Oct-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
10-Oct-2013 |
11-Oct-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
10-Oct-2013 |
11-Oct-2013 |
Calgary, AB, Canada |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
10-Oct-2013 |
11-Oct-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
10-Oct-2013 |
11-Oct-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
10-Oct-2013 |
11-Oct-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Spanish |
| EHY2511 Flare Network Design and Rating |
10-Oct-2013 |
11-Oct-2013 |
Perth, Australia |
AUD 1320 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
10-Oct-2013 |
11-Oct-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
10-Oct-2013 |
11-Oct-2013 |
Tokyo, Japan |
JPY 86000 |
Register Now |
Logistics
|
Japanese |
| EHY2511 Flare Network Design and Rating |
10-Oct-2013 |
11-Oct-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| PME231 Aspen Real-Time SPC: Using and Configuring (Aspen Q) |
10-Oct-2013 |
11-Oct-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| PME305 Aspen InfoPlus.21: Advanced System Administration |
10-Oct-2013 |
11-Oct-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP121 Building MS Excel User Interfaces for Aspen Plus Simulations Using Aspen Simulation Workbook |
11-Oct-2013 |
11-Oct-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
October 14 - October 18, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| APC1400 Introduction to Advanced Process Control using DMCplus |
14-Oct-2013 |
17-Oct-2013 |
Reading, UK |
GBP 1600 |
Register Now |
Logistics
|
English |
| EAP121 Building MS Excel User Interfaces for Aspen Plus Simulations Using Aspen Simulation Workbook |
14-Oct-2013 |
14-Oct-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
14-Oct-2013 |
14-Oct-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP2510 CO2 Removal Processes Using Aspen Plus |
14-Oct-2013 |
16-Oct-2013 |
Virtual-EMEA |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
14-Oct-2013 |
16-Oct-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
14-Oct-2013 |
18-Oct-2013 |
Reading, UK |
GBP 2000 |
Register Now |
Logistics
|
English |
| APC1400 Introduction to Advanced Process Control using DMCplus |
15-Oct-2013 |
18-Oct-2013 |
Houston, TX |
USD 2400 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
15-Oct-2013 |
17-Oct-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
15-Oct-2013 |
17-Oct-2013 |
Virtual-Latin America |
USD 1050 |
Register Now |
Logistics
|
Spanish |
| EAP2211 Modeling Complex Processes with Equation Oriented Methods |
15-Oct-2013 |
15-Oct-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EEE102 Aspen Process Economic Analyzer (Aspen IPE) |
15-Oct-2013 |
17-Oct-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
15-Oct-2013 |
17-Oct-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
15-Oct-2013 |
15-Oct-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| PME222 Building Content for Aspen Role Based Visualization (RBV) |
15-Oct-2013 |
17-Oct-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| PME261 Aspen Production Execution Manager: Programming Concepts (Aspen eBRS) |
15-Oct-2013 |
17-Oct-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| RPA100 Essential PIMS Concepts and Economic Analysis for Managers & Economists |
15-Oct-2013 |
16-Oct-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Spanish |
| RPA102 Introduction to Aspen PIMS for Petrochemical Planning |
15-Oct-2013 |
18-Oct-2013 |
Houston, TX |
USD 2100 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
16-Oct-2013 |
16-Oct-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP2311 Building Custom Simulation Models using Aspen Custom Modeler |
16-Oct-2013 |
18-Oct-2013 |
Virtual-EMEA |
GBP 1200 |
Register Now |
Logistics
|
English |
| EAP321 Aspen Plus: Advanced Topics in Equation Oriented Modeling |
16-Oct-2013 |
16-Oct-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
17-Oct-2013 |
18-Oct-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Spanish |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
17-Oct-2013 |
18-Oct-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
17-Oct-2013 |
17-Oct-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
17-Oct-2013 |
18-Oct-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
17-Oct-2013 |
18-Oct-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
17-Oct-2013 |
17-Oct-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
17-Oct-2013 |
18-Oct-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
17-Oct-2013 |
18-Oct-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| PME231 Aspen Real-Time SPC: Using and Configuring (Aspen Q) |
17-Oct-2013 |
18-Oct-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| PME305 Aspen InfoPlus.21: Advanced System Administration |
17-Oct-2013 |
18-Oct-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
October 21 - October 25, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| APC2400 Advanced Process Control Application Development and Online Deployment |
21-Oct-2013 |
22-Oct-2013 |
Virtual-Asia Pacific |
SGD 1480 |
Register Now |
Logistics
|
English |
| APC2400 Advanced Process Control Application Development and Online Deployment |
21-Oct-2013 |
23-Oct-2013 |
Singapore |
SGD 2220 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
21-Oct-2013 |
23-Oct-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EAP121 Building MS Excel User Interfaces for Aspen Plus Simulations Using Aspen Simulation Workbook |
21-Oct-2013 |
21-Oct-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EAP2411 Improved Process Operability and Control through Aspen Plus Dynamic Models |
21-Oct-2013 |
23-Oct-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
21-Oct-2013 |
22-Oct-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP2980 Simulation of Electrolyte Processes With Aspen Plus |
21-Oct-2013 |
22-Oct-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EAP301 Aspen Plus: Real Time Modeling and Optimization |
21-Oct-2013 |
24-Oct-2013 |
Houston, TX |
USD 2400 |
Register Now |
Logistics
|
English |
| EEE103 Aspen In-Plant Cost Estimator (Aspen IPM) |
21-Oct-2013 |
23-Oct-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
21-Oct-2013 |
22-Oct-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
21-Oct-2013 |
23-Oct-2013 |
Calgary, AB, Canada |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
21-Oct-2013 |
23-Oct-2013 |
Pune, India |
INR 24600 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
21-Oct-2013 |
23-Oct-2013 |
Jakarta, Indonesia |
USD 900 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
21-Oct-2013 |
23-Oct-2013 |
Chennai, India |
INR 24600 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
21-Oct-2013 |
23-Oct-2013 |
Virtual-Latin America |
USD 1050 |
Register Now |
Logistics
|
Spanish |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
21-Oct-2013 |
23-Oct-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
21-Oct-2013 |
23-Oct-2013 |
Virtual-EMEA |
GBP 1200 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
21-Oct-2013 |
25-Oct-2013 |
Virtual-EMEA |
GBP 2000 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
21-Oct-2013 |
25-Oct-2013 |
Houston, TX |
USD 3000 |
Register Now |
Logistics
|
English |
| PME311 Aspen InfoPlus.21: Applications Development |
21-Oct-2013 |
25-Oct-2013 |
Virtual-Latin America |
USD 1750 |
Register Now |
Logistics
|
Spanish |
| RBS131 Aspen Refinery Multi-Blend Optimizer: Blend Planning and Scheduling (Aspen MBO) |
21-Oct-2013 |
22-Oct-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
21-Oct-2013 |
25-Oct-2013 |
Virtual-EMEA |
GBP 2000 |
Register Now |
Logistics
|
English |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
21-Oct-2013 |
25-Oct-2013 |
Virtual-Latin America |
USD 1750 |
Register Now |
Logistics
|
Spanish |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
21-Oct-2013 |
25-Oct-2013 |
Houston, TX |
USD 3000 |
Register Now |
Logistics
|
English |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
21-Oct-2013 |
25-Oct-2013 |
Houston, TX |
USD 3000 |
Register Now |
Logistics
|
English |
| RPA151 Aspen Advisor: Operations Reconciliation and Accounting |
21-Oct-2013 |
23-Oct-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| RPA201 Aspen PIMS: Solving Refinery Planning Problems |
21-Oct-2013 |
25-Oct-2013 |
Virtual-Americas |
USD 3000 |
Register Now |
Logistics
|
English |
| RPA301 Aspen PIMS: Advanced Refinery Planning Models |
21-Oct-2013 |
25-Oct-2013 |
Virtual-Americas |
USD 3000 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
22-Oct-2013 |
22-Oct-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
24-Oct-2013 |
25-Oct-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
24-Oct-2013 |
24-Oct-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EAP251 Aspen Rate-Based Distillation (Aspen RateSep) |
24-Oct-2013 |
25-Oct-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EAU2831 Introduction to Energy Optimization Using Aspen Utilities Planner |
24-Oct-2013 |
25-Oct-2013 |
Beijing, China |
USD 600 |
Register Now |
Logistics
|
Chinese |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
24-Oct-2013 |
25-Oct-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
24-Oct-2013 |
25-Oct-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
24-Oct-2013 |
25-Oct-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Spanish |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
24-Oct-2013 |
24-Oct-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
24-Oct-2013 |
24-Oct-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
24-Oct-2013 |
25-Oct-2013 |
Jakarta, Indonesia |
USD 600 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
24-Oct-2013 |
25-Oct-2013 |
Calgary, AB, Canada |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
24-Oct-2013 |
25-Oct-2013 |
Chennai, India |
INR 16400 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
24-Oct-2013 |
25-Oct-2013 |
Pune, India |
INR 16400 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
24-Oct-2013 |
24-Oct-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EOP171 Develop and Implement Operator Training Simulator (OTS) using Aspen OTS |
24-Oct-2013 |
25-Oct-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| SLM101 Aspen Software License Management and Deployment |
24-Oct-2013 |
25-Oct-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
25-Oct-2013 |
25-Oct-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EAP2911 Solids Modeling Using Aspen Plus |
25-Oct-2013 |
25-Oct-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
25-Oct-2013 |
25-Oct-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
25-Oct-2013 |
25-Oct-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EOP161 Introduction to Aspen Online Deployment for Performance Monitoring of Critical Plant Equipment |
25-Oct-2013 |
25-Oct-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
October 28 - November 1, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| EAP101 Aspen Plus: Process Modeling |
28-Oct-2013 |
30-Oct-2013 |
Tokyo, Japan |
JPY 129000 |
Register Now |
Logistics
|
Japanese |
| EAP101 Aspen Plus: Process Modeling |
28-Oct-2013 |
30-Oct-2013 |
Virtual-EMEA |
GBP 1200 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
28-Oct-2013 |
28-Oct-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP2411 Improved Process Operability and Control through Aspen Plus Dynamic Models |
28-Oct-2013 |
30-Oct-2013 |
Virtual-EMEA |
GBP 1200 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
28-Oct-2013 |
29-Oct-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Spanish |
| EAP301 Aspen Plus: Real Time Modeling and Optimization |
28-Oct-2013 |
31-Oct-2013 |
Virtual-Americas |
USD 2400 |
Register Now |
Logistics
|
English |
| EEE103 Aspen In-Plant Cost Estimator (Aspen IPM) |
28-Oct-2013 |
30-Oct-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EHX2911 Improved Energy Efficiency through Heat Integration |
28-Oct-2013 |
30-Oct-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
28-Oct-2013 |
30-Oct-2013 |
Chennai, India |
INR 24600 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
28-Oct-2013 |
30-Oct-2013 |
Calgary, AB, Canada |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
28-Oct-2013 |
30-Oct-2013 |
Jakarta, Indonesia |
USD 900 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
28-Oct-2013 |
30-Oct-2013 |
Pune, India |
INR 24600 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
28-Oct-2013 |
30-Oct-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
28-Oct-2013 |
30-Oct-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
28-Oct-2013 |
01-Nov-2013 |
Virtual-Americas |
USD 3000 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
28-Oct-2013 |
01-Nov-2013 |
Virtual-Latin America |
USD 1750 |
Register Now |
Logistics
|
Spanish |
| PME141 Aspen IP.21 Process Browser (Web.21): User Training |
28-Oct-2013 |
28-Oct-2013 |
Beijing, China |
USD 300 |
Register Now |
Logistics
|
Chinese |
| RBS131 Aspen Refinery Multi-Blend Optimizer: Blend Planning and Scheduling (Aspen MBO) |
28-Oct-2013 |
29-Oct-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
28-Oct-2013 |
01-Nov-2013 |
Virtual-Americas |
USD 3000 |
Register Now |
Logistics
|
English |
| PME241 Aspen IP.21 Process Browser (Web.21): Configuring |
29-Oct-2013 |
30-Oct-2013 |
Beijing, China |
USD 600 |
Register Now |
Logistics
|
Chinese |
| EAP2911 Solids Modeling Using Aspen Plus |
30-Oct-2013 |
30-Oct-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| RPA151 Aspen Advisor: Operations Reconciliation and Accounting |
30-Oct-2013 |
01-Nov-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP121 Building MS Excel User Interfaces for Aspen Plus Simulations Using Aspen Simulation Workbook |
31-Oct-2013 |
31-Oct-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
31-Oct-2013 |
01-Nov-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EAP2121 Process Flowsheet Convergence in Aspen Plus |
31-Oct-2013 |
31-Oct-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
31-Oct-2013 |
01-Nov-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
31-Oct-2013 |
01-Nov-2013 |
Pune, India |
INR 16400 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
31-Oct-2013 |
01-Nov-2013 |
Chennai, India |
INR 16400 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
31-Oct-2013 |
01-Nov-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
31-Oct-2013 |
31-Oct-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
31-Oct-2013 |
31-Oct-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
31-Oct-2013 |
01-Nov-2013 |
Jakarta, Indonesia |
USD 600 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
31-Oct-2013 |
01-Nov-2013 |
Calgary, AB, Canada |
USD 1200 |
Register Now |
Logistics
|
English |
| PME122 - Aspen Process Explorer: Using and Configuring |
31-Oct-2013 |
31-Oct-2013 |
Beijing, China |
USD 300 |
Register Now |
Logistics
|
Chinese |
| RPA221 Aspen PIMS: Advanced Optimization Features |
31-Oct-2013 |
01-Nov-2013 |
Singapore |
SGD 1480 |
Register Now |
Logistics
|
English |
| SLM101 Aspen Software License Management and Deployment |
31-Oct-2013 |
01-Nov-2013 |
Virtual-Americas |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
01-Nov-2013 |
01-Nov-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
01-Nov-2013 |
01-Nov-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
01-Nov-2013 |
02-Nov-2013 |
Tokyo, Japan |
JPY 86000 |
Register Now |
Logistics
|
Japanese |
| EHY208 Aspen HYSYS: Migration to V8 |
01-Nov-2013 |
01-Nov-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| PME123 Aspen Calc: Using and Configuring |
01-Nov-2013 |
02-Nov-2013 |
Beijing, China |
USD 450 |
Register Now |
Logistics
|
Chinese |
November 4 - November 8, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| EAP101 Aspen Plus: Process Modeling |
04-Nov-2013 |
06-Nov-2013 |
Virtual-Americas |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
04-Nov-2013 |
05-Nov-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EEE1011 Introduction to Aspen Capital Cost Estimator |
04-Nov-2013 |
07-Nov-2013 |
Virtual-EMEA |
GBP 1600 |
Register Now |
Logistics
|
English |
| EEE1011 Introduction to Aspen Capital Cost Estimator |
04-Nov-2013 |
07-Nov-2013 |
Calgary, AB, Canada |
USD 2400 |
Register Now |
Logistics
|
English |
| EEE1011 Introduction to Aspen Capital Cost Estimator |
04-Nov-2013 |
07-Nov-2013 |
Houston, TX |
USD 2400 |
Register Now |
Logistics
|
English |
| EEE1011 Introduction to Aspen Capital Cost Estimator |
04-Nov-2013 |
07-Nov-2013 |
Houston, TX |
USD 2400 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
04-Nov-2013 |
06-Nov-2013 |
Virtual-Latin America |
USD 1050 |
Register Now |
Logistics
|
Portuguese |
| EHY101 Aspen HYSYS: Process Modeling |
04-Nov-2013 |
06-Nov-2013 |
Virtual-EMEA |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
04-Nov-2013 |
06-Nov-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| PME201 Aspen SQLplus for Aspen InfoPlus.21: Using and Configuring for Power Users |
04-Nov-2013 |
08-Nov-2013 |
Houston, TX |
USD 3000 |
Register Now |
Logistics
|
English |
| PME201 Aspen SQLplus for Aspen InfoPlus.21: Using and Configuring for Power Users |
04-Nov-2013 |
08-Nov-2013 |
Virtual-EMEA |
GBP 2000 |
Register Now |
Logistics
|
English |
| RBS121 Aspen Petroleum Scheduler: Building and Using Models (Aspen Orion XT) |
04-Nov-2013 |
08-Nov-2013 |
Reading, UK |
GBP 2000 |
Register Now |
Logistics
|
English |
| RPA100 Essential PIMS Concepts and Economic Analysis for Managers & Economists |
04-Nov-2013 |
05-Nov-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Spanish |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
04-Nov-2013 |
08-Nov-2013 |
Pune, India |
INR 41000 |
Register Now |
Logistics
|
English |
| RPA201 Aspen PIMS: Solving Refinery Planning Problems |
04-Nov-2013 |
08-Nov-2013 |
Virtual-EMEA |
GBP 2000 |
Register Now |
Logistics
|
English |
| RPA201 Aspen PIMS: Solving Refinery Planning Problems |
04-Nov-2013 |
08-Nov-2013 |
Singapore |
SGD 3700 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
05-Nov-2013 |
05-Nov-2013 |
Virtual-Asia Pacific |
SGD 740 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
05-Nov-2013 |
06-Nov-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| APC2400 Advanced Process Control Application Development and Online Deployment |
06-Nov-2013 |
07-Nov-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP121 Building MS Excel User Interfaces for Aspen Plus Simulations Using Aspen Simulation Workbook |
06-Nov-2013 |
06-Nov-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
06-Nov-2013 |
06-Nov-2013 |
Singapore |
SGD 740 |
Register Now |
Logistics
|
English |
| EHX1041 Introduction to Aspen Plate Fin Exchanger |
06-Nov-2013 |
06-Nov-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY2351 Modeling Heavy Oil & Gas Production and Facilities Using Aspen HYSYS Upstream |
06-Nov-2013 |
07-Nov-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| PME122 - Aspen Process Explorer: Using and Configuring |
06-Nov-2013 |
06-Nov-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP2611 Heat Transfer Modeling Using Aspen Plus |
07-Nov-2013 |
07-Nov-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
07-Nov-2013 |
08-Nov-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Portuguese |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
07-Nov-2013 |
08-Nov-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
07-Nov-2013 |
08-Nov-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
07-Nov-2013 |
07-Nov-2013 |
Virtual-Asia Pacific |
SGD 740 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
07-Nov-2013 |
07-Nov-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EHY2312 Create Custom Unit Operations and Kinetic Model Extensions using VB 6.0 for Aspen HYSYS |
07-Nov-2013 |
08-Nov-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
07-Nov-2013 |
08-Nov-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| PME123 Aspen Calc: Using and Configuring |
07-Nov-2013 |
08-Nov-2013 |
Reading, UK |
GBP 600 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
08-Nov-2013 |
08-Nov-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EAP2121 Process Flowsheet Convergence in Aspen Plus |
08-Nov-2013 |
08-Nov-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
08-Nov-2013 |
08-Nov-2013 |
Calgary, AB, Canada |
USD 600 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
08-Nov-2013 |
08-Nov-2013 |
Singapore |
SGD 740 |
Register Now |
Logistics
|
English |
November 11 - November 15, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| APC2400 Advanced Process Control Application Development and Online Deployment |
11-Nov-2013 |
13-Nov-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
11-Nov-2013 |
13-Nov-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
11-Nov-2013 |
13-Nov-2013 |
Virtual-Latin America |
USD 1050 |
Register Now |
Logistics
|
Portuguese |
| EAP208 Aspen Plus: Migration to V8 |
11-Nov-2013 |
11-Nov-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP2411 Improved Process Operability and Control through Aspen Plus Dynamic Models |
11-Nov-2013 |
13-Nov-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
11-Nov-2013 |
12-Nov-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EAP251 Aspen Rate-Based Distillation (Aspen RateSep) |
11-Nov-2013 |
11-Nov-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EEE103 Aspen In-Plant Cost Estimator (Aspen IPM) |
11-Nov-2013 |
13-Nov-2013 |
Calgary, AB, Canada |
USD 1800 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
11-Nov-2013 |
12-Nov-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
11-Nov-2013 |
12-Nov-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EHX131 Heat Exchanger Mechanical Design using Aspen Shell & Tube Mechanical (Aspen Teams) |
11-Nov-2013 |
11-Nov-2013 |
Singapore |
SGD 740 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
11-Nov-2013 |
13-Nov-2013 |
Aberdeen, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
11-Nov-2013 |
13-Nov-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
11-Nov-2013 |
13-Nov-2013 |
Stavanger, Norway |
EUR 2400 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
11-Nov-2013 |
12-Nov-2013 |
Seoul, Korea |
KRW 550000 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
11-Nov-2013 |
15-Nov-2013 |
Reading, UK |
GBP 2000 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
11-Nov-2013 |
15-Nov-2013 |
Pune, India |
INR 41000 |
Register Now |
Logistics
|
English |
| PME311 Aspen InfoPlus.21: Applications Development |
11-Nov-2013 |
15-Nov-2013 |
Houston, TX |
USD 3000 |
Register Now |
Logistics
|
English |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
11-Nov-2013 |
15-Nov-2013 |
Virtual-Latin America |
USD 1750 |
Register Now |
Logistics
|
Spanish |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
11-Nov-2013 |
15-Nov-2013 |
Reading, UK |
GBP 2000 |
Register Now |
Logistics
|
English |
| EAP2121 Process Flowsheet Convergence in Aspen Plus |
12-Nov-2013 |
12-Nov-2013 |
Virtual-Asia Pacific |
SGD 740 |
Register Now |
Logistics
|
English |
| EAP2121 Process Flowsheet Convergence in Aspen Plus |
12-Nov-2013 |
12-Nov-2013 |
Singapore |
SGD 740 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
12-Nov-2013 |
12-Nov-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP121 Building MS Excel User Interfaces for Aspen Plus Simulations Using Aspen Simulation Workbook |
13-Nov-2013 |
13-Nov-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
13-Nov-2013 |
13-Nov-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP2510 CO2 Removal Processes Using Aspen Plus |
13-Nov-2013 |
15-Nov-2013 |
Singapore |
SGD 2220 |
Register Now |
Logistics
|
English |
| EAP2510 CO2 Removal Processes Using Aspen Plus |
13-Nov-2013 |
15-Nov-2013 |
Virtual-Asia Pacific |
SGD 2200 |
Register Now |
Logistics
|
English |
| EHX2911 Improved Energy Efficiency through Heat Integration |
13-Nov-2013 |
15-Nov-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
13-Nov-2013 |
15-Nov-2013 |
Seoul, Korea |
KRW 825000 |
Register Now |
Logistics
|
English |
| PME171 Aspen Production Record Manager: Retrieving Batch Data using the Reporting Tools |
13-Nov-2013 |
13-Nov-2013 |
Virtual-Asia Pacific |
SGD 740 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
14-Nov-2013 |
15-Nov-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
14-Nov-2013 |
15-Nov-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Portuguese |
| EAP2121 Process Flowsheet Convergence in Aspen Plus |
14-Nov-2013 |
14-Nov-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
14-Nov-2013 |
15-Nov-2013 |
Calgary, AB, Canada |
USD 1200 |
Register Now |
Logistics
|
English |
| EHX131 Heat Exchanger Mechanical Design using Aspen Shell & Tube Mechanical (Aspen Teams) |
14-Nov-2013 |
14-Nov-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHX131 Heat Exchanger Mechanical Design using Aspen Shell & Tube Mechanical (Aspen Teams) |
14-Nov-2013 |
14-Nov-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
14-Nov-2013 |
14-Nov-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
14-Nov-2013 |
15-Nov-2013 |
Stavanger, Norway |
EUR 1600 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
14-Nov-2013 |
15-Nov-2013 |
Aberdeen, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
14-Nov-2013 |
14-Nov-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY2351 Modeling Heavy Oil & Gas Production and Facilities Using Aspen HYSYS Upstream |
14-Nov-2013 |
15-Nov-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
14-Nov-2013 |
15-Nov-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| PME271 Aspen Production Record Manager: Configuring the Batch Area and Feed Application |
14-Nov-2013 |
15-Nov-2013 |
Virtual-Asia Pacific |
SGD 1480 |
Register Now |
Logistics
|
English |
| RPA221 Aspen PIMS: Advanced Optimization Features |
14-Nov-2013 |
15-Nov-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
15-Nov-2013 |
15-Nov-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
November 18 - November 22, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| APC2600 Advanced Process Control Performance Monitoring |
18-Nov-2013 |
20-Nov-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| APC2600 Advanced Process Control Performance Monitoring |
18-Nov-2013 |
20-Nov-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
18-Nov-2013 |
20-Nov-2013 |
Frankfurt, Germany |
EUR 1560 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
18-Nov-2013 |
20-Nov-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EAP2510 CO2 Removal Processes Using Aspen Plus |
18-Nov-2013 |
20-Nov-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
18-Nov-2013 |
19-Nov-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
18-Nov-2013 |
20-Nov-2013 |
Perth, Australia |
AUD 1980 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
18-Nov-2013 |
20-Nov-2013 |
Calgary, AB, Canada |
USD 1800 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
18-Nov-2013 |
19-Nov-2013 |
Seoul, Korea |
KRW 550000 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
18-Nov-2013 |
20-Nov-2013 |
Virtual-EMEA |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
18-Nov-2013 |
20-Nov-2013 |
Virtual-Latin America |
USD 1050 |
Register Now |
Logistics
|
Portuguese |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
18-Nov-2013 |
20-Nov-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
18-Nov-2013 |
22-Nov-2013 |
Virtual-Latin America |
USD 1750 |
Register Now |
Logistics
|
Spanish |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
18-Nov-2013 |
22-Nov-2013 |
Houston, TX |
USD 3000 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
18-Nov-2013 |
22-Nov-2013 |
Virtual-EMEA |
GBP 2000 |
Register Now |
Logistics
|
English |
| PME171 Aspen Production Record Manager: Retrieving Batch Data using the Reporting Tools |
18-Nov-2013 |
18-Nov-2013 |
Singapore |
SGD 740 |
Register Now |
Logistics
|
English |
| PME261 Aspen Production Execution Manager: Programming Concepts (Aspen eBRS) |
18-Nov-2013 |
20-Nov-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| RBS131 Aspen Refinery Multi-Blend Optimizer: Blend Planning and Scheduling (Aspen MBO) |
18-Nov-2013 |
19-Nov-2013 |
Pune, India |
INR 16400 |
Register Now |
Logistics
|
English |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
18-Nov-2013 |
22-Nov-2013 |
Houston, TX |
USD 3000 |
Register Now |
Logistics
|
English |
| EEE1011 Introduction to Aspen Capital Cost Estimator |
19-Nov-2013 |
22-Nov-2013 |
Reading, UK |
GBP 1600 |
Register Now |
Logistics
|
English |
| EHY2102 Aspen HYSYS Petroleum Refining: Process Modeling and Optimization for Refinery Unit Operations |
19-Nov-2013 |
21-Nov-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| PME271 Aspen Production Record Manager: Configuring the Batch Area and Feed Application |
19-Nov-2013 |
20-Nov-2013 |
Singapore |
SGD 1480 |
Register Now |
Logistics
|
English |
| EAP2510 CO2 Removal Processes Using Aspen Plus |
20-Nov-2013 |
22-Nov-2013 |
Seoul, Korea |
KRW 825000 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
21-Nov-2013 |
22-Nov-2013 |
Frankfurt, Germany |
EUR 1040 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
21-Nov-2013 |
22-Nov-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EAP2980 Simulation of Electrolyte Processes With Aspen Plus |
21-Nov-2013 |
22-Nov-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
21-Nov-2013 |
21-Nov-2013 |
Virtual-Latin America |
USD 350 |
Register Now |
Logistics
|
Portuguese |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
21-Nov-2013 |
21-Nov-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
21-Nov-2013 |
21-Nov-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
21-Nov-2013 |
22-Nov-2013 |
Calgary, AB, Canada |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
21-Nov-2013 |
22-Nov-2013 |
Perth, Australia |
AUD 1320 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
21-Nov-2013 |
21-Nov-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EPD201 Aspen Batch Distillation: Modeling Batch Distillation Processes (Aspen BatchSep) |
21-Nov-2013 |
22-Nov-2013 |
Tokyo, Japan |
JPY 64500 |
Register Now |
Logistics
|
Japanese |
| PME361 Aspen Production Execution Manager: Administration (Aspen eBRS) |
21-Nov-2013 |
22-Nov-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
22-Nov-2013 |
22-Nov-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
22-Nov-2013 |
22-Nov-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EAP2911 Solids Modeling Using Aspen Plus |
22-Nov-2013 |
22-Nov-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
22-Nov-2013 |
22-Nov-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
November 25 - November 29, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| EAP101 Aspen Plus: Process Modeling |
25-Nov-2013 |
27-Nov-2013 |
Virtual-EMEA |
GBP 1200 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
25-Nov-2013 |
26-Nov-2013 |
Seoul, Korea |
KRW 550000 |
Register Now |
Logistics
|
English |
| EAP2311 Building Custom Simulation Models using Aspen Custom Modeler |
25-Nov-2013 |
27-Nov-2013 |
Frankfurt, Germany |
EUR 1560 |
Register Now |
Logistics
|
English |
| EAP2911 Solids Modeling Using Aspen Plus |
25-Nov-2013 |
25-Nov-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EEE102 Aspen Process Economic Analyzer (Aspen IPE) |
25-Nov-2013 |
27-Nov-2013 |
Tokyo, Japan |
JPY 129000 |
Register Now |
Logistics
|
Japanese |
| EEE102 Aspen Process Economic Analyzer (Aspen IPE) |
25-Nov-2013 |
27-Nov-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
25-Nov-2013 |
27-Nov-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
25-Nov-2013 |
27-Nov-2013 |
Perth, Australia |
AUD 1980 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
25-Nov-2013 |
26-Nov-2013 |
Virtual-Asia Pacific |
SGD 1480 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
25-Nov-2013 |
26-Nov-2013 |
Singapore |
SGD 1480 |
Register Now |
Logistics
|
English |
| PME201 Aspen SQLplus for Aspen InfoPlus.21: Using and Configuring for Power Users |
25-Nov-2013 |
29-Nov-2013 |
Reading, UK |
GBP 2000 |
Register Now |
Logistics
|
English |
| RPA201 Aspen PIMS: Solving Refinery Planning Problems |
25-Nov-2013 |
29-Nov-2013 |
Reading, UK |
GBP 2000 |
Register Now |
Logistics
|
English |
| EAP2121 Process Flowsheet Convergence in Aspen Plus |
27-Nov-2013 |
27-Nov-2013 |
Seoul, Korea |
KRW 275000 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
27-Nov-2013 |
29-Nov-2013 |
Singapore |
SGD 2220 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
28-Nov-2013 |
29-Nov-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
28-Nov-2013 |
29-Nov-2013 |
Frankfurt, Germany |
EUR 1040 |
Register Now |
Logistics
|
English |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
28-Nov-2013 |
28-Nov-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
28-Nov-2013 |
29-Nov-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
December 2 - December 6, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| APC2900 Process Property Estimator Development and Deployment |
02-Dec-2013 |
04-Dec-2013 |
Houston, TX |
USD 1800 |
Register Now |
Logistics
|
English |
| EAP2311 Building Custom Simulation Models using Aspen Custom Modeler |
02-Dec-2013 |
04-Dec-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
02-Dec-2013 |
03-Dec-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Portuguese |
| EAP281 Aspen Plus: Process Simulation with Aspen Polymers |
02-Dec-2013 |
04-Dec-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EAP301 Aspen Plus: Real Time Modeling and Optimization |
02-Dec-2013 |
05-Dec-2013 |
Reading, UK |
GBP 1600 |
Register Now |
Logistics
|
English |
| EHX131 Heat Exchanger Mechanical Design using Aspen Shell & Tube Mechanical (Aspen Teams) |
02-Dec-2013 |
02-Dec-2013 |
Pune, India |
INR 8200 |
Register Now |
Logistics
|
English |
| EHX131 Heat Exchanger Mechanical Design using Aspen Shell & Tube Mechanical (Aspen Teams) |
02-Dec-2013 |
02-Dec-2013 |
Chennai, India |
INR 8200 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
02-Dec-2013 |
04-Dec-2013 |
Beijing, China |
USD 900 |
Register Now |
Logistics
|
Chinese |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
02-Dec-2013 |
04-Dec-2013 |
Calgary, AB, Canada |
USD 1800 |
Register Now |
Logistics
|
English |
| PME201 Aspen SQLplus for Aspen InfoPlus.21: Using and Configuring for Power Users |
02-Dec-2013 |
06-Dec-2013 |
Virtual-EMEA |
GBP 2000 |
Register Now |
Logistics
|
English |
| PME305 Aspen InfoPlus.21: Advanced System Administration |
02-Dec-2013 |
03-Dec-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Spanish |
| RPA151 Aspen Advisor: Operations Reconciliation and Accounting |
02-Dec-2013 |
04-Dec-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| APC2900 Process Property Estimator Development and Deployment |
03-Dec-2013 |
05-Dec-2013 |
Singapore |
SGD 2220 |
Register Now |
Logistics
|
English |
| APC2900 Process Property Estimator Development and Deployment |
03-Dec-2013 |
05-Dec-2013 |
Virtual-Asia Pacific |
SGD 2220 |
Register Now |
Logistics
|
English |
| EHX2911 Improved Energy Efficiency through Heat Integration |
03-Dec-2013 |
05-Dec-2013 |
Chennai, India |
INR 24600 |
Register Now |
Logistics
|
English |
| EHX2911 Improved Energy Efficiency through Heat Integration |
03-Dec-2013 |
05-Dec-2013 |
Pune, India |
INR 24600 |
Register Now |
Logistics
|
English |
| EAP121 Building MS Excel User Interfaces for Aspen Plus Simulations Using Aspen Simulation Workbook |
04-Dec-2013 |
04-Dec-2013 |
Virtual-Latin America |
USD 350 |
Register Now |
Logistics
|
Portuguese |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
04-Dec-2013 |
06-Dec-2013 |
Tokyo, Japan |
JPY 129000 |
Register Now |
Logistics
|
Japanese |
| EHY2351 Modeling Heavy Oil & Gas Production and Facilities Using Aspen HYSYS Upstream |
04-Dec-2013 |
05-Dec-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
05-Dec-2013 |
05-Dec-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EAP250 Aspen Plus: Distillation Modeling |
05-Dec-2013 |
06-Dec-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EAP2611 Heat Transfer Modeling Using Aspen Plus |
05-Dec-2013 |
05-Dec-2013 |
Virtual-Latin America |
USD 350 |
Register Now |
Logistics
|
Portuguese |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
05-Dec-2013 |
06-Dec-2013 |
Beijing, China |
USD 600 |
Register Now |
Logistics
|
Chinese |
| EHY208 Aspen HYSYS: Migration to V8 |
05-Dec-2013 |
05-Dec-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
05-Dec-2013 |
06-Dec-2013 |
Chennai, India |
INR 16400 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
05-Dec-2013 |
06-Dec-2013 |
Calgary, AB, Canada |
USD 1200 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
05-Dec-2013 |
06-Dec-2013 |
Pune, India |
INR 16400 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
05-Dec-2013 |
06-Dec-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| RPA221 Aspen PIMS: Advanced Optimization Features |
05-Dec-2013 |
06-Dec-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| EAP121 Building MS Excel User Interfaces for Aspen Plus Simulations Using Aspen Simulation Workbook |
06-Dec-2013 |
06-Dec-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
06-Dec-2013 |
06-Dec-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
06-Dec-2013 |
06-Dec-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
06-Dec-2013 |
06-Dec-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
December 9 - December 13, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| APC2900 Process Property Estimator Development and Deployment |
09-Dec-2013 |
11-Dec-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EAP101 Aspen Plus: Process Modeling |
09-Dec-2013 |
11-Dec-2013 |
Tokyo, Japan |
JPY 129000 |
Register Now |
Logistics
|
Japanese |
| EAU2831 Introduction to Energy Optimization Using Aspen Utilities Planner |
09-Dec-2013 |
10-Dec-2013 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EEE1011 Introduction to Aspen Capital Cost Estimator |
09-Dec-2013 |
12-Dec-2013 |
Calgary, AB, Canada |
USD 2400 |
Register Now |
Logistics
|
English |
| EHY101 Aspen HYSYS: Process Modeling |
09-Dec-2013 |
11-Dec-2013 |
Virtual-Latin America |
USD 1050 |
Register Now |
Logistics
|
Spanish |
| EHY2102 Aspen HYSYS Petroleum Refining: Process Modeling and Optimization for Refinery Unit Operations |
09-Dec-2013 |
11-Dec-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
09-Dec-2013 |
11-Dec-2013 |
Singapore |
SGD 2220 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
09-Dec-2013 |
11-Dec-2013 |
Stavanger, Norway |
EUR 2400 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
09-Dec-2013 |
11-Dec-2013 |
Beijing, China |
USD 900 |
Register Now |
Logistics
|
Chinese |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
09-Dec-2013 |
11-Dec-2013 |
Reading, UK |
GBP 1200 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
09-Dec-2013 |
13-Dec-2013 |
Reading, UK |
GBP 2000 |
Register Now |
Logistics
|
English |
| PME1200 Calculations and Data Analysis for Engineers |
09-Dec-2013 |
11-Dec-2013 |
Virtual-Latin America |
USD 1050 |
Register Now |
Logistics
|
Spanish |
| PME1200 Calculations and Data Analysis for Engineers |
09-Dec-2013 |
11-Dec-2013 |
Virtual-EMEA |
GBP 1200 |
Register Now |
Logistics
|
English |
| RBS121 Aspen Petroleum Scheduler: Building and Using Models (Aspen Orion XT) |
09-Dec-2013 |
13-Dec-2013 |
Pune, India |
INR 41000 |
Register Now |
Logistics
|
English |
| PME122 - Aspen Process Explorer: Using and Configuring |
11-Dec-2013 |
11-Dec-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP121 Building MS Excel User Interfaces for Aspen Plus Simulations Using Aspen Simulation Workbook |
12-Dec-2013 |
12-Dec-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
12-Dec-2013 |
13-Dec-2013 |
Tokyo, Japan |
JPY 86000 |
Register Now |
Logistics
|
Japanese |
| EAP250 Aspen Plus: Distillation Modeling |
12-Dec-2013 |
13-Dec-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EHX2911 Improved Energy Efficiency through Heat Integration |
12-Dec-2013 |
14-Dec-2013 |
Singapore |
SGD 2220 |
Register Now |
Logistics
|
English |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
12-Dec-2013 |
13-Dec-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Spanish |
| EHY202 Aspen HYSYS: Advanced Process Modeling Topics |
12-Dec-2013 |
13-Dec-2013 |
Stavanger, Norway |
EUR 1600 |
Register Now |
Logistics
|
English |
| EHY2511 Flare Network Design and Rating |
12-Dec-2013 |
13-Dec-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| PME123 Aspen Calc: Using and Configuring |
12-Dec-2013 |
13-Dec-2013 |
Virtual-EMEA |
GBP 600 |
Register Now |
Logistics
|
English |
| RBS131 Aspen Refinery Multi-Blend Optimizer: Blend Planning and Scheduling (Aspen MBO) |
12-Dec-2013 |
13-Dec-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| RPA221 Aspen PIMS: Advanced Optimization Features |
12-Dec-2013 |
13-Dec-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
13-Dec-2013 |
13-Dec-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
13-Dec-2013 |
13-Dec-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
13-Dec-2013 |
13-Dec-2013 |
Calgary, AB, Canada |
USD 600 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
13-Dec-2013 |
13-Dec-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
December 16 - December 20, 2013
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| EAP101 Aspen Plus: Process Modeling |
16-Dec-2013 |
18-Dec-2013 |
Virtual-Latin America |
USD 1050 |
Register Now |
Logistics
|
Spanish |
| EEE102 Aspen Process Economic Analyzer (Aspen IPE) |
16-Dec-2013 |
18-Dec-2013 |
Calgary, AB, Canada |
USD 1800 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
16-Dec-2013 |
17-Dec-2013 |
Virtual-Asia Pacific |
SGD 1480 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
16-Dec-2013 |
17-Dec-2013 |
Singapore |
SGD 1480 |
Register Now |
Logistics
|
English |
| EHY223 Aspen HYSYS Dynamics: Introduction to Dynamic Modeling |
16-Dec-2013 |
18-Dec-2013 |
Virtual-EMEA |
GBP 1200 |
Register Now |
Logistics
|
English |
| PME101 Aspen InfoPlus.21: Real Time Information Management Foundation |
16-Dec-2013 |
20-Dec-2013 |
Virtual-EMEA |
GBP 2000 |
Register Now |
Logistics
|
English |
| PME305 Aspen InfoPlus.21: Advanced System Administration |
16-Dec-2013 |
17-Dec-2013 |
Reading, UK |
GBP 800 |
Register Now |
Logistics
|
English |
| RPA100 Essential PIMS Concepts and Economic Analysis for Managers & Economists |
16-Dec-2013 |
17-Dec-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Spanish |
| RPA101 Aspen PIMS: Introduction to Refinery Planning |
16-Dec-2013 |
20-Dec-2013 |
Virtual-EMEA |
GBP 2000 |
Register Now |
Logistics
|
English |
| RPA153 Aspen Report Writer for Aspen PIMS |
16-Dec-2013 |
16-Dec-2013 |
Pune, India |
INR 8200 |
Register Now |
Logistics
|
English |
| RPA201 Aspen PIMS: Solving Refinery Planning Problems |
16-Dec-2013 |
18-Dec-2013 |
Tokyo, Japan |
JPY 129000 |
Register Now |
Logistics
|
Japanese |
| EAP2911 Solids Modeling Using Aspen Plus |
18-Dec-2013 |
18-Dec-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
18-Dec-2013 |
19-Dec-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EHX1021 Design and Rate Air Cooled Heat Exchangers |
18-Dec-2013 |
18-Dec-2013 |
Virtual-Asia Pacific |
SGD 740 |
Register Now |
Logistics
|
English |
| EHX1021 Design and Rate Air Cooled Heat Exchangers |
18-Dec-2013 |
18-Dec-2013 |
Singapore |
SGD 740 |
Register Now |
Logistics
|
English |
| EAP201 Aspen Plus: Physical Properties for Process Engineers |
19-Dec-2013 |
20-Dec-2013 |
Virtual-Latin America |
USD 700 |
Register Now |
Logistics
|
Spanish |
| EAP208 Aspen Plus: Migration to V8 |
19-Dec-2013 |
19-Dec-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
19-Dec-2013 |
19-Dec-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EHX1011 Design and Rate Shell and Tube Heat Exchangers |
19-Dec-2013 |
20-Dec-2013 |
Calgary, AB, Canada |
USD 1200 |
Register Now |
Logistics
|
English |
| EHX1031 Design and Simulation of Fired Heaters Using Aspen Fired Heater |
19-Dec-2013 |
19-Dec-2013 |
Virtual-Asia Pacific |
SGD 740 |
Register Now |
Logistics
|
English |
| EHX1031 Design and Simulation of Fired Heaters Using Aspen Fired Heater |
19-Dec-2013 |
19-Dec-2013 |
Singapore |
SGD 740 |
Register Now |
Logistics
|
English |
| EHY121 Building MS Excel User Interfaces for Aspen HYSYS Simulations Using Aspen Simulation Workbook |
19-Dec-2013 |
19-Dec-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EHY208 Aspen HYSYS: Migration to V8 |
19-Dec-2013 |
19-Dec-2013 |
Virtual-Americas |
USD 600 |
Register Now |
Logistics
|
English |
| PME305 Aspen InfoPlus.21: Advanced System Administration |
19-Dec-2013 |
20-Dec-2013 |
Virtual-EMEA |
GBP 800 |
Register Now |
Logistics
|
English |
| EAP208 Aspen Plus: Migration to V8 |
20-Dec-2013 |
20-Dec-2013 |
Reading, UK |
GBP 400 |
Register Now |
Logistics
|
English |
| EAP2911 Solids Modeling Using Aspen Plus |
20-Dec-2013 |
20-Dec-2013 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |
| EHX1031 Design and Simulation of Fired Heaters Using Aspen Fired Heater |
20-Dec-2013 |
20-Dec-2013 |
Virtual-EMEA |
GBP 400 |
Register Now |
Logistics
|
English |
| EHX1041 Introduction to Aspen Plate Fin Exchanger |
20-Dec-2013 |
20-Dec-2013 |
Virtual-Asia Pacific |
SGD 740 |
Register Now |
Logistics
|
English |
| EHX1041 Introduction to Aspen Plate Fin Exchanger |
20-Dec-2013 |
20-Dec-2013 |
Singapore |
SGD 740 |
Register Now |
Logistics
|
English |
January 6 - January 10, 2014
|
| Course Name | Start Date | End Date | Location | Price | Registration | Time-Address | Language |
| EOP171 Develop and Implement Operator Training Simulator (OTS) using Aspen OTS |
09-Jan-2014 |
10-Jan-2014 |
Houston, TX |
USD 1200 |
Register Now |
Logistics
|
English |
| EOP161 Introduction to Aspen Online Deployment for Performance Monitoring of Critical Plant Equipment |
10-Jan-2014 |
10-Jan-2014 |
Houston, TX |
USD 600 |
Register Now |
Logistics
|
English |